Walkway Cover connecting to Haven of Hope Hospital, Tseung Kwan O

Project Description:

The objective of the proposed works is to enhance the walking environment for people travelling to and from the Haven of Hope Hospital. The works mainly comprise of the construction of walkway cover along the footpath of Ling Hong Road connecting Haven of Hope Hospital and the existing bus stop nearby; and associated civil works, electrical and mechanical works, drainage works and lighting works.

Construction Commencement Date:

May 2024

Anticipated Commissioning Date:

2026

Contract(s):

Contract No. HY/2023/18

Contract Title Walkway Covers connecting to Grantham Hospital at Wong Chuk Hang and Haven of Hope Hospital at Tseung Kwan O
Commencement
Date
May 2024
Anticipated Completion Date 2026
Contract Sum ($M) 41.99
Contractor Hang Kee Development Company Limited
Resident Engineer Meinhardt Infrastructure and Environment Limited

Consultant:

Meinhardt Infrastructure and Environment Limited