Project Description:

This Project aims to provide a comfortable and convenient pedestrian link between Hing Shing Road and Tai Wo Hau Road and covers to walkways connecting the hospitals to public transport facilities nearby for enhancing the walking environment for peoples travelling to and from the hospitals.

Construction Commencement Date :

July 2023

Anticipated Commissioning Date :

3rd Quarter of 2026

Contract(s):

Contract No. HY/2023/07

Scope
  1. Demolition of existing staircase connecting Hing Shing Road and Tai Wo Hau Road;
  2. Construction of a covered two-way escalator and staircase with stair-lift connecting Hing Shing Road and Tai Wo Hau Road;
  3. Construction of retaining wall and reprovisioning of affected structures and facilities;
  4. Slope works at Hing Shing Road Playground;
  5. Construction of walkway covers near Hong Kong Eye Hospital, Tuen Mun Hospital and Tang Shiu Kin Hospital respectively and;
  6. Associated civil works, geotechnical works, electrical and mechanical works, modification works for the existing walkways, roads and drainage works, lighting works and landscaping works.
Commencement
Date
July 2023
Anticipated Completion Date Q3 2026
Contract Sum HK$181.2 Million
Contractor WYC Joint Venture
Resident Engineer Mannings (Asia) Consultants Limited

 

Consultant:

Mannings (Asia) Consultants Limited