Skip to content Skip to menu Skip to search box
Brand Hong Kong
GovHK 香港政府一站通
English繁體版简体版
Level Double-A conformance, W3C WAI Web Content Accessibility Guidelines 2.0HKQAA ISO 9001 Certification MarkHKQAA ISO 14001 Certification MarkWeb Accessibility Recognition Scheme

Prequalification and Tender Notices

 

Published Date Closing Date Reference Subject
There is no outstanding tender notice at the moment.

Closed Tender Notices

Published Date Closing Date Reference Subject
12 July 2019 12:00 noon,
Friday,
6 September 2019
HY/2019/01
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Phase 2 and Other Works
2 August 2019 12:00 noon,
Friday,
30 August 2019
HY/2019/18 Wan Chai Development Phase II and Central – Wan Chai Bypass – Sampling, Field Measurement and Testing Works (Stage 4)
14 June 2019 12:00 noon,
Friday,
9 August 2019
HY/2019/04 Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
14 June 2019 12:00 noon,
Friday,
26 July 2019
HY/2019/11 Retrofitting of Noise Barriers on Long Tin Road
17 May 2019 12:00 noon,
Friday,
28 June 2019
03/HY/2019 Management, Operation, Installation and Maintenance of the Public Lighting System in New Territories West (2019-2023)
22 March 2019 12:00 noon,
Friday,
17 May 2019
HY/2019/08 Initial Tree Data Collection Services for Highways Department, Hong Kong (Stage 2) – Cat. 1 Zone Areas in the New Territories and Expressways
22 February 2019 12:00 noon on
Friday,
26 April 2019
HY/2018/03 Elevated Pedestrian Corridor in Yuen Long Town connecting with Long Ping Station
15 March 2019 12:00 noon,
Friday,
12 April 2019
HY/2019/06 Re-painting of Noise Barriers and Noise Enclosures at Lai Chi Kok Viaduct
22 February 2019 12:00 noon on
Friday,
12 April 2019
HY/2019/02 Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung
1 March 2019 12:00 noon on
Friday,
29 March 2019
HY/2018/08
Extension of Tender Period
Central Kowloon Route – Central Tunnel
19 January 2019 12:00 noon on
Friday,
1 March 2019
HY/2018/11 Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 3 Contract 1
28 December 2018 12:00 noon on
Friday,
15 February 2019
HY/2019/05 Footbridge near MTR Kowloon Bay Station Exit B
21 December 2018 12:00 noon on
Friday,
1 February 2019
HY/2018/12 Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 4 Contract 1
7 December 2018 12:00 noon, on
Friday,
11 January 2019
HY/2018/02
Extension of Tender Period
Central Kowloon Route – Kai Tak East
9 November 2018 12:00 noon on
Friday,
21 December 2018
05/HY/2018 Highways Department Term Contract (Management and Maintenance of Expressways and High Speed Roads in New Territories East, Kowloon East and Hong Kong Island 2019-2025)
14 September 2018 12:00 noon on
Friday,
26 October 2018
HY/2018/09 Lift and Pedestrian Walkway System between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung
31 August 2018 12:00 noon on
Friday,
28 September 2018
HY/2018/06 Initial Tree Data Collection Services for  Highways Department, Hong Kong (Stage 2) –New Territories West, Expressways (East) and Expressways (West)
31 August 2018 12:00 noon on
Friday,
28 September 2018
HY/2018/04 Initial Tree Data Collection Services for Highways Department, Hong Kong (Stage 2) – New Territories East and Islands
15 June 2018 12:00 noon on
Friday,
27 July 2018
01/HY/2018 Management, Operation, Installation and Maintenance of the Public Lighting System in Kowloon and New Territories East (2018-2022)
5 June 2018 12:00 noon on
Thursday,
28 June 2018
HY/2018/07 Site and Laboratory Testing Services for Principal Inspection of Tate’s Cairn Tunnel
26 January 2018 12:00 noon on
Friday,
2 March 2018
HY/2017/10
Extension of Tender Period
Tuen Mun – Chek Lap Kok Link - Northern Connection Tunnel Buildings, Electrical and Mechanical Works
26 January 2018 12:00 noon on
Friday,
2 March 2018
HY/2014/10
Extension of Tender Period
Tuen Mun – Chek Lap Kok Link – Northern Connection Traffic Control and Surveillance System
8 December 2017 12:00 noon on
Friday,
29 December 2017
HY/2017/12
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 3 – Pre-construction Works Contract P1
8 December 2017 12:00 noon on
Friday,
29 December 2017
HY/2017/13
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 4 – Pre-construction Works Contract P1
20 October 2017 12:00 noon on
Friday,
1 December 2017
06/HY/2017
Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2018-2024)
20 October 2017 12:00 noon on
Friday,
1 December 2017
05/HY/2017
Highways Department Term Contract (Management and Maintenance of Roads in Kowloon East excluding Expressways and High Speed Roads 2018-2024)
15 September 2017 12:00 noon on
Friday,
3 November 2017
HY/2014/20
Extension of Tender Period
Central Kowloon Route – Yau Ma Tei West
24 August 2017 12:00 noon on
Thursday,
14 September 2017
HY/2017/08 Site and Laboratory Testing Services for Principal Inspection of Shing Mun Tunnel and Tseung Kwan O Tunnel.
16 June 2017 12:00 noon on
Friday,
28 July 2017
01/HY/2017
Management, Operation, Installation and Maintenance of the Public Lighting System in Hong Kong Island and Lamma Island (2017-2021)
2 June 2017 12:00 noon on
Friday,
30 June 2017
HY/2014/07
Further Extension of Tender Period
Central Kowloon Route - Kai Tak West
19 May 2017 12:00 noon on
Friday,
16 June 2017
HY/2014/08
Further Extension of Tender Period
Central Kowloon Route – Yau Ma Tei East
10 March 2017 12:00 noon on
Friday,
7 April 2017
HY/2014/09
Extension of Tender Period
Central Kowloon Route - Ho Man Tin Access Shaft
15 February 2017 12:00 noon on
Thursday,
9 March 2017
HY/2017/04 Site and Laboratory Testing Services for Principal Inspection of Lion Rock Tunnel
10 February 2017 12:00 noon on
Friday,
3 March 2017
HY/2017/03 Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in Urban Region (Package B)
13 January 2017 12:00 noon on
Friday,
24 February 2017
HY/2017/02 Lift and Pedestrian Walkway System between Kwai Shing Circuit and Hing Shing Road, Kwai Chung
23 December 2016 12:00 noon on
Friday,
24 February 2017
HY/2016/02 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 9
30 December 2016 12:00 noon on
Friday,
10 February 2017
HY/2016/05 Footbridge connecting Tsuen Wan Plaza, Skyline Plaza and adjacent landscaping area
14 October 2016 12:00 noon on
Friday,
25 November 2016
01/HY/2016 Highways Department Term Contract (Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads 2017-2023)
30 September 2016 12:00 noon on
Friday,
11 November 2016
HY/2016/06 Lift and Pedestrian Walkway System at Cheung Hang Estate, Tsing Yi
19 August 2016 12:00 noon on
Friday,
30 September 2016
HY/2016/04 Elevated Walkway between Tong Ming Street and Tong Tak Street, Tseung Kwan O
15 July 2016 12:00 noon on
Friday,
26 August 2016
HY/2016/03 Lift and Pedestrian Walkway System at Waterloo Hill
15 July 2016 12:00 noon on
Friday,
5 August 2016
HY/2014/17
Further Extension of Tender Period
Tuen Mun – Chek Lap Kok Link - Northern Connection Tunnel Buildings, Electrical and Mechanical Works
18 March 2016 12:00 noon on
Friday,
29 April 2016
HY/2015/06
Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 8
29 January 2016 12:00 noon on
Friday,
11 March 2016
HY/2014/14
Retrofitting of Noise Barriers on Tuen Mun Road – Fu Tei Section
26 January 2016 12:00 noon on
Thursday,
25 February 2016
HY/2015/08
Site and Laboratory Testing Services for Principal Inspection of Aberdeen Tunnel
11 December 2015 12:00 noon on
Friday,
8 January 2016
19/HY/2014
Preventive Maintenance Programme (2016 - 2019)
Upgrading/Improvement Works for Roadside Man-made Slopes/Retaining Walls in New Territories
4 December 2015 12:00 noon on
Thursday,
31 December 2015
HY/2014/13
Construction of Access Road joining She Shan Road, Tai Po and Improvement of Nam Wai Road, Sai Kung
25 September 2015 12:00 noon on
Friday,
11 December 2015
HY/2014/16
Hiram’s Highway Improvement Stage 1 – between Clear Water Bay Road and Marina Cove
3 November 2015 12:00 noon on
Thursday,
26 November 2015
HY/2015/07
Site and Laboratory Testing Services for the Eastern Harbour Crossing
16 October 2015 12:00 noon on
Friday,
27 November 2015
03/HY/2015
Highways Department Term Contract (Management and Maintenance of High Speed Roads in New Territories West and Kowloon, and Roads in Hong Kong Port Area 2016-2022)
16 October 2015 12:00 noon on
Friday,
27 November 2015
02/HY/2015
Highways Department Term Contract (Management and Maintenance of Roads in Tai Po and North Districts excluding High Speed Roads 2016-2022)
25 September 2015 12:00 noon on
Friday,
6 November 2015
HY/2013/19
Retrofitting of Noise Barriers on Tuen Mun Road – Town Centre Section
26 June 2015 12:00 noon on
Friday,
7 August 2015
HY/2014/18
Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 7
19 June 2015 12:00 noon on
Friday,
10 July 2015
02/HY/2014
Preventive Maintenance Programme (2016 – 2019)
Ground Investigation for Roadside Man-made Slopes/Retaining Walls in New Territories
22 May 2015 12:00 noon on
Friday,
3 July 2015
01/HY/2015
Management, Operation, Installation and Maintenance of the Public Lighting System in New Territories West (2015-2019)
15 May 2015 12:00 noon on
Friday,
19 June 2015
HY/2014/05
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Remaining Ancillary Buildings and Facilities
27 March 2015 12:00 noon on
Friday,
22 May 2015
HY/2014/04 Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Gantry Type X-ray Vehicle Inspection System
12 March 2015 12:00 noon on
Thursday,
19 March 2015
HY/2014/11
Extension of Tender Period
Site and Laboratory Testing Services for the Cross-Harbour Tunnel
6 February 2015 12:00 noon on
Friday,
13 March 2015
HY/2013/06
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Automatic Vehicle Clearance Support System
23 January 2015 12:00 noon on
Friday,
6 March 2015
HY/2014/12 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 6
12 December 2014 12:00 noon on
Friday,
9 January 2015
HY/2014/03 Provision of Lift and Staircase to Existing Footbridge Linking Chung Fu LRT Station and Tin Wah Estate Ancillary Facilities Block, Tin Shui Wai
17 October 2014 12:00 noon on
Friday,
28 November 2014
01/HY/2014
Highways Department Term Contract (Management and Maintenance of Roads in New Territories West excluding High Speed Roads 2015-2021)
10 October 2014 12:00 noon on
Friday,
21 November 2014
HY/2014/06
Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 5
4 July 2014 12:00 noon on
Friday,
18 July 2014
HY/2013/03
Further Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Vehicle Clearance Plazas and Ancillary Buildings and Facilities
16 May 2014 12:00 noon,
Friday,
27 June 2014
18/HY/2013 Management, Operation, Installation and Maintenance of the Public Lighting System in Kowloon and New Territories East (2014-2018)
23 May 2014 12:00 noon,
Friday,
13 June 2014
HY/2013/04
Further Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Infrastructure Works Stage II (Southern Portion)
28 March 2014 12.00 noon,
Friday,
9 May 2014
HY/2013/23 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 4
4 April 2014 12:00 noon on
Friday,
2 May 2014
HY/2013/12
Further Extension of Tender Period
Tuen Mun – Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works
2 April 2014 12:00 noon on
Friday,
25 April 2014
HY/2013/14
An Amendment to "Remarks"
Pedestrian Link between Tsing Yi North Bridge and Tsing Yi Station and Provision of Coach Lay-by at Moving Memorial to War Martyrs, Tai Mong Tsai Road, Sai Kung
21 March 2014 12:00 noon,
Friday,
11 April 2014
HY/2013/24 Central Kowloon Route – Utility Survey at Yau Ma Tei and Ma Tau Kok
21 February 2014 12:00 noon,
Friday,
4 April 2014
HY/2013/19 Retrofitting of Noise Barriers on Tuen Mun Road – Town Centre Section
24 January 2014 12:00 noon on
Friday,
7 March 2014
HY/2013/17 Road Improvement Works in West Kowloon Reclamation Development
17 January 2014 12:00 noon on
Friday,
28 February 2014
HY/2013/22 Initial Tree Data Collection Services for Highways Department, Hong Kong
3 January 2014 12:00 noon on Friday,
21 February 2014
HY/2013/02
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Infrastructure Works Stage I (Western Portion)
3 January 2014 12:00 noon, on Friday,
14 February 2014
HY/2013/16 Provision of Barrier-free Access Facilities for Highway Structures – Phase 2 Contract 2
13 December 2013 12:00 noon, on Friday,
20 December 2013
HY/2013/15
Extension of Tender Period
Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 3
25 October 2013 12:00 noon on Friday, 6 December 2013 09/HY/2013 Highways Department Term Contract (Management and Maintenance of Roads in Kowloon West excluding High Speed Roads 2014-2020)
25 October 2013 12:00 noon on Friday, 6 December 2013 08/HY/2013 Highways Department Term Contract (Management and Maintenance of Roads in Kowloon East excluding High Speed Roads 2014-2018)
18 October 2013 12:00 noon on Friday, 29 November 2013 HY/2013/01
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Passenger Clearance Building
13 September 2013 12:00 noon on Friday, 25 October 2013 HY/2013/11 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 2
30 August 2013 12:00 noon on Friday, 27 September 2013 HY/2013/05
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities and Hong Kong Link Road, and Tuen Mun – Chek Lap Kok Link Southern Connection – Traffic Control and Surveillance System
2 August 2013 12:00 noon on Friday, 30 August 2013 HY/2013/13 Extension of the CITIC Tower Footbridge to LegCo Complex at Tamar
2 August 2013 12:00 noon on Friday, 30 August 2013 HY/2011/08
Extension of Tender Period
Central – Wan Chai Bypass – Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning
31 May 2013 12:00 noon on Friday, 19 July 2013 07/HY/2013 Management, Operation, Installation and Maintenance of the Public Lighting System in Hong Kong Island and Lamma Island (2013-2017)
24 May 2013 12:00 noon on Friday, 14 June 2013 HY/2013/10 Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in Urban Region (Package A)
24 May 2013 12:00 noon on Friday, 14 June 2013 HY/2011/05 Improvement of Access Roads at Mok Tse Che, Sai Kung and Tai Po Mei, Tai Po
15 March 2013 12:00 noon on Friday, 12 April 2013 HY/2012/09
Extension of Tender Period
Improvement of Kam Pok Road – Man Yuen Chuen Section and Proposed Vehicular Bridge across the Nullah at Kiu Hing Road near Wong Nai Tun
18 January 2013 12.00 noon on Friday, 15 February 2013 HY/2012/07
Extension of Tender Period
Tuen Mun – Chek Lap Kok Link – Southern Connection Viaduct Section
9 November 2012 12:00 noon on Friday, 21 December 2012 05/HY/2012 Highways Department Term Contract (Management and Maintenance of High Speed Roads in New Territories East and Hong Kong Island 2013 - 2019)
26 October 2012 12:00 noon on Friday, 7 December 2012 HY/2012/12 Provision of Barrier-free Access Facilities for Highway Structures – Phase 2
26 October 2012 12.00 noon, Friday, 7 December 2012 HY/2012/11 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 1
5 October 2012 12:00 noon on Friday, 16 November 2012 HY/2012/03
The Acquisition of Road Inventory Data by Using the Technology of Mobile Mapping System for Hong Kong
28 September 2012 12:00 noon on Friday, 26 October 2012 HY/2010/08
Extension of Tender Period
Central-Wan Chai Bypass – Tunnel (Slip Road 8 Section)
17 August 2012 12:00 noon on Friday, 14 September 2012 HY/2012/06
Extension of Tender Period
Widening of Fanling Highway - Tai Hang to Wo Hop Shek Interchange
10 August 2012 12:00 noon on Friday, 24 August 2012

HY/2011/13
Further Extension of Tender Period

Improvement to Pok Oi Interchange
22 June 2012 12:00 noon on Friday, 3 August 2012 HY/2012/01 Provision of Lifts/Ramps to Four Footbridges across Aberdeen Praya Road and Yue Shi Cheung Road, across Tsuen Wan MTR Depot near Mega Trade Centre, across Castle Peak Road near Fou Wah Centre and across Choi Yuen Road and San Wan Road at Pak Wo Road, and Two Subways across Ching Hong Road near Mayfair Gardens and across Tai Po Road near Fo Tan Road
25 May 2012 12:00 noon on Tuesday, 3
July 2012
HY/2012/08 Tuen Mun – Chek Lap Kok Link – Northern Connection Sub-sea Tunnel Section
9 March 2012 12:00 noon on Friday, 20
April 2012
HY/2012/04 Ground Investigation Works for Tuen Mun – Chek Lap Kok Link
28 October 2011 12:00 noon on Friday, 23 December 2011 HY/2008/13 Reconstruction and Improvement of Tuen Mun Road – Traffic Control and Surveillance System
21 October 2011 12:00 noon on Friday, 2 December 2011 07/HY/2011 Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding High Speed Roads 2012 - 2018)
21 October 2011 12:00 noon on Friday, 2 December 2011 06/HY/2011 Highways Department Term Contract (Management and Maintenance of Roads in Tai Po and North Districts excluding High Speed Roads 2012 - 2016)
7 October 2011 12.00 noon on Friday, 28 October 2011 HY/2011/12
Provision of Lifts to Two Footbridges across Waterloo Road near Suffolk Road and across Tsing Yi Heung Sze Wui Road near Vigor Industrial Building, and Two Subways across Aberdeen Praya Road near Old Main Street Aberdeen and across Tai Po Road near Pei Ho Street
19 August 2011 12.00 noon on Friday, 30 September 2011 HY/2010/10
Retrofitting of Noise Barriers on Tai Po Tai Wo Road near Po Nga Court
7 July 2011 12:00 noon on Friday, 15 July 2011 HY/2010/05
Further Extension of Tender Period
Upgrading of Tai Kong Po Access Road, Pat Heung, Yuen Long and Proposed Footpath Across Nullah Near the Junction of Ngau Pei Sha Street and Kwong Sin Street, Shatin
20 May 2011 12:00 noon on Friday, 8 July 2011 01/HY/2011 Management, Operation, Installation and Maintenance of the Public Lighting System in New Territories West (2011-2015)
29 April 2011 12:00 noon on Friday, 8 July 2011 HY/2010/02
Extension of Tender Period
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Reclamation Works
20 May 2011 12:00 noon on Friday, 10 June 2011 HY/2011/04 Ground Investigation Works for Hong Kong-Zhuhai-Macao Bridge Related Projects
1 April 2011 12:00 noon on Friday, 13 May 2011 HY/2010/09 Improvement and Extension of Kam Pok Road
11 March 2011 12:00 noon on Friday, 1 April 2011 HY/2010/07 Provision of Lifts to Two Footbridges across Wong Chuk Hang Road near Yip Kan Street and across Leighton Road and Irving Street; a Bridge across Tuen Mun Road near Tsing To Path and a Subway across Pak Wo Road near Fung Ying Sin Koon
22 October 2010 12:00 noon on Friday, 3 December 2010 04/HY/2010 Highways Department Term Contract (Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads 2011 - 2017)
20 August 2010 12:00 noon on Friday, 3 September 2010 HY/2009/19
Extension of Tender Period
Central – Wan Chai Bypass – Tunnel (North Point Section) and Island Eastern Corridor Link
2 July 2010 12:00 noon on Friday, 13 August 2010 HY/2009/04 Noise Barriers on Fanling Highway between MTR Fanling Station and Wo Hing Road
25 June 2010 12:00 noon on Friday, 9 July 2010 HY/2009/18
Extension of Tender Period
Central – Wan Chai Bypass – Central Interchange
20 May 2010 12:00 noon on Friday, 2 July 2010 01/HY/2010 Management, Operation, Installation and Maintenance of the Public Lighting System in Kowloon and New Territories East (2010-2014)
9 April 2010 12:00 noon on Friday, 7 May 2010 24/HY/2009 Improvement of Emergency Openings at Central Dividers
1 April 2010 12:00 noon on Friday, 16 April 2010 HY/2009/15
Extension of Tender Period
Central-Wan Chai Bypass – Tunnel (Causeway Bay Typhoon Shelter Section)
19 February 2010 12:00 noon on Friday, 9 April 2010 HY/2008/12 Bus-Bus Interchanges on Tuen Mun Road
22 January 2010 12:00 noon on Friday, 12 February 2010 HY/2009/12 Proposed Walkway Cover at Tsing King Road between Ching Wang Court and MTR Tsing Yi Station, Tsing Yi

Archives