Road Resurfacing Works under Construction

(as at 31 December 2025)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Actual
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
Contract
No.
Tsing Yi Road
(between L/P FC1008 and GC1260)
5,000 360 2.88 01/2024 03/2026 05/HY/2020
Tsing Yi Heung Sze Wui Road
(between L/P FC3536 and FC1029)
7,500 350 5.55 07/2024 06/2026 05/HY/2020
Tuen Mun Heung Sze Wui Road
(i) Between Pui To Road and Tsing Yin Street
(ii) near Hoi Chu Road
4,200 400 2.50 09/2024 01/2026 04/HY/2020
Route Twisk (between L/P no. FA5482 and L/P no.FA5503 4,300 280 5.67 08/2025 08/2026 05/HY/2020
Castle Peak Road – Lam Tei
(Section between L/P FA8099 and FB2252)
7,500 600 5.20 08/2025 09/2026 04/HY/2020
Castle Peak Road – Lam Tei
(Section between L/P FB2249 and FB5864)
6,500 600 5.00 08/2025 09/2026 04/HY/2020
Hung Hom Bypass Northbound fast and slow lane(between L/P AB4938 and BB2296) 4,300 460 3.80 09/2025 08/2026 12/HY/2019
Hoi Wang Road Southbound between Yan Cheung Road and Jordan Road 4,500 284 3.60 08/2025 11/2026 12/HY/2019
Sha Tsui Road
(between L/P FA1771 and FA1804, Eastbound)
2,000 300 1.20 12/2025 08/2026 05/HY/2020
Po Shek Wu Road between L/P AD2642 and N1705 5,710 450 3.34 11/2025 02/2026 07/HY2021
Tuen Mun Road (A Bound)
Ch60.35 to Ch59.5 Full Width
13,580 850 5.95 12/2025 03/2026 08/HY/2021
Junction of Tai Chung Kiu Road and Sha Tin Wai Road 6,000 400 5.80 12/2021 03/2026 03/HY/2023
Siu Lek Yuen Road (Westbound)
(between Sha Tin Wai Road and Chap Wai Kon Street)
3,600 350 2.90 11/2022 03/2026 03/HY/2023
Tai Po Road - Ma Liu Shui section between L/P no. EB0055 to EC0782 5,100 450 3.20 12/2025 03/2026 03/HY/2023
Fo Tan Road section between L/P BE0321 to BE0221 7,800 880 5.00 11/2025 05/2026 03/HY/2023
i) Tolo Highway, B Bound near CH9.68 Slip to Chak Cheung Street Round-about, Full Width and ii) Tate’s Cairn Highway, North Bound, near CH18.46 Slip Road to Chak Cheung Street Round-about. 4,500 520 2.40 12/2025 02/2026 15/HY/2024
Kwai Shing Circuit from Tai Wo Hau Road to Kwai Luen Road (between L/P FA9784 and FA9800) 4,950 440 2.46 10/2025 09/2026 05/HY/2020
So Kwun Wat Road, Tuen Mun
(Both Bound Between L/P AD7326 and AJ0318)
6,000 700 3.00 10/2025 03/2026 04/HY/2020
Repair Anti-Skid Surface Dressing at West Kowloon Corridor near between L/P AA9411 & AA9206 3,800 500 2.15 10/2025 03/2027 12/HY/2019
Cold Milling & Resurfacing of Flexible Carriageway with Highly Modified Stone Mastic Asphalt 10 (HMSMA10) at Cheung Yee Street between Cheung Mou Street & Tai Nan West Street 2,400 250 2.20 10/2025 09/2026 12/HY/2019
Cold Milling & Resurfacing with Highly Modified Stone Mastic Asphalt (HMSMA6) at Tonkin Street (South Bound) Section between Un Chau Street & Cheung Sha Wan Road 2,000 200 1.60 10/2025 08/2026 12/HY/2019
Cold Milling & Resurfacing with Highly Modified Friction Course (HMFC) at West Kowloon Corridor (East Bound) Section between Hing Wah Street & Tonkin Street 5,400 600 3.40 10/2025 09/2027 12/HY/2019
Shum Wan Road
(section between L/P 42423 and L/P 43824)
2,980 500 1.20 11/2025 03/2026 14/HY/2024