Road Resurfacing Works under Construction

(as at 31 March 2025)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Actual
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
Contract
No.
Junction of Tai Chung Kiu Road and Fo Tan Road 8,500 570 7.00 08/2022 06/2025 03/HY/2023
Junction of Tai Chung Kiu Road and Sha Tin Wai Road 6,000 400 5.80 12/2021 06/2025 03/HY/2023
Ma Tin Road (Section Between L/P: DD1877 and BD1373) & Shap Pat Heung Road (Section Between L/P: BD1433 and BD1440) 3,900 450 1.10 03/2023 09/2025 04/HY/2020
Siu Lek Yuen Road (Westbound)
(between Sha Tin Wai Road and Chap Wai Kon Street)
3,600 350 2.90 11/2022 06/2025 03/HY/2023
Tsing Yi Road
(between L/P FC1008 and GC1260)
5,000 360 2.88 01/2024 09/2025 05/HY/2020
Tai Lam Chung Road
(between L/P CD1946 and FB4894)
3,000 800 0.90 01/2024 04/2025 04/HY/2020
Junction of Tuen Hi Road Tuen Hing Road 1,200 400 0.55 09/2024 09/2025 04/HY/2020
Tsing Yi Heung Sze Wui Road
(between L/P FC3536 and FC1029)
7,500 350 5.55 07/2024 04/2025 05/HY/2020
Nga Ying Chau Street
(near Ching Nga Court)
1,600 160 1.20 12/2024 07/2025 05/HY/2020
Ching Hong Road
(between L/P W4000 and W5000)
1,100 90 0.50 12/2024 04/2025 05/HY/2020
Castle Peak Road-Kwai Chung
(between L/P FB2860 and FA6326)
5,600 420 3.60 11/2024 09/2025 05/HY/2020
Tsuen Wan Road, East Bound, CH14.90 to CH14.52 4,015 380 1.79 03/2025 05/2025 08/HY/2021
Tuen Mun Heung Sze Wui Road
(i) Between Pui To Road and Tsing Yin Street
(ii) near Hoi Chu Road
4,200 400 2.50 09/2024 01/2026 04/HY/2020
Mei Tin Road J/O Chik Wan Street 2,000 130 2.00 01/2025 05/2025 03/HY/2023
Kam Tin Road Section
(i) From L/P BD1119 to CD1912 (Eastbound & Westbound)
(ii) From L/P BD1953 to FB5762 (Eastbound) and
(iii)From L/P BD1957 to FB5756 (Westbound)
4,200 840 2.70 10/2024 06/2025 04/HY/2020
Kam Tin Road Section
(i) From L/P FB1480 to L/P CD2188
(ii) From L/P CD1912 to L/P AJ0932
(iii)From L/P AD1686 to L/P AD1681 and
(iv)From L/P AD1638 to L/P AD1642
6,000 1,200 3.20 09/2024 06/2025 04/HY/2020
Ramp D of Shenzhen Bay Bridge, Northbound (CH0.35 to CH0.1) 1,990 207 1.11 03/2025 04/2025 08/HY/2021
Kwun Tong Bypass (South Bound)
(near Wang Chiu Road)
11,900 1,153 6.78 03/2025 06/2025 05/HY/2018
Ching Hong Road
(between L/P W4661 and W2537)
2,400 400 1.77 03/2025 05/2025 05/HY/2020
Eastern Harbour Crossing (EHC), North Bound, Toll Plaza 9,500 1,000 7.98 03/2024 12/2025 02/HY/2023
Cheung Fat Street
(Section between L/P GF3294 & AA3259)
2,400 198 1.51 10/2024 02/2025 12/HY/2019
Tseung Kwan O Road (Section between L/P AA8749 & AA8673) 6,000 1,200 2.50 12/2024 06/2025 02/HY/2023
Lung Cheung Road btween L/P E6998 and AA7382 2,500 200 1.30 01/2025 06/2025 05/HY/2017
Kwun Tong Road Btn L/P E8313 and K9471 2,700 350 1.35 02/2025 07/2025 05/HY/2017
Pok Fu Lam Road between L/P 32259 and 34300 2,100 400 3.00 12/2024 05/2025 12/HY/2019
Resurfacing of the Defective Flexible Carriageway at Sheung Fung Street from LP AA8571 to E1193 and Ming Fung Street from LP E4833 to E1193 3,000 500 1.70 02/2025 12/2025 02/HY/2023
Wai Yip Street Eastbound (Section from WSD KB Office to Lai Yip Street) 8,000 1,000 2.88 02/2025 06/2025 02/HY/2023
West Kowloon Corridor Eastbound
(between L/P AA9204 and L/P AA9410)
4,700 465 2.76 08/2023 09/2025 12/HY/2019