Road Resurfacing Works under Construction

(as at 30 September 2025)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Actual
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
Contract
No.
Junction of Tai Chung Kiu Road and Sha Tin Wai Road 6,000 400 5.80 12/2021 10/2025 03/HY/2023
Siu Lek Yuen Road (Westbound)
(between Sha Tin Wai Road and Chap Wai Kon Street)
3,600 350 2.90 11/2022 10/2025 03/HY/2023
Tsing Yi Road
(between L/P FC1008 and GC1260)
5,000 360 2.88 01/2024 02/2026 05/HY/2020
Tsing Yi Heung Sze Wui Road
(between L/P FC3536 and FC1029)
7,500 350 5.55 07/2024 12/2025 05/HY/2020
Tuen Mun Heung Sze Wui Road
(i) Between Pui To Road and Tsing Yin Street
(ii) near Hoi Chu Road
4,200 400 2.50 09/2024 01/2026 04/HY/2020
Eastern Harbour Crossing (EHC), North Bound, Toll Plaza 9,500 1,000 7.98 03/2024 12/2025 02/HY/2023
Kwun Tong Road Btn L/P E8313 and K9471 2,700 350 1.35 02/2025 10/2025 02/HY/2023
Resurfacing of the Defective Flexible Carriageway at Sheung Fung Street from LP AA8571 to E1193 and Ming Fung Street from LP E4833 to E1193 3,000 500 1.70 02/2025 12/2025 02/HY/2023
Lung Kwu Tan Road (Section between L/P AD0632 and AD0647) 4,200 600 2.20 11/2024 04/2026 04/HY/2020
Lei Yue Mun Road Btn L/P AA8709 and AA8753 1,600 220 1.40 04/2025 12/2025 02/HY/2023
Lei Yue Mun Road Btn L/P BF0996 and AA4578 5,600 480 2.70 04/2025 12/2025 02/HY/2023
Yau Tong Road Btn L/P AF1852 and BF0998 4,500 600 2.70 04/2025 12/2025 02/HY/2023
Tsing Sha Highway
(i) South Bound, CH33.20 to CH32.40, Fast and Slow Lanes; and
(ii) South Bound, CH32.40 to CH31.95, Lanes 3 and 4
10,800 1,250 3.55 08/2025 11/2025 15/HY/2024
FANLING HIGHWAY, North Bound, from CH27.05 to
27.75, Fast Lane and Half of Middle Lane
4,500 700 1.40 08/2025 11/2025 15/HY/2024
North Lantau Highway, East Bound
Fast Lane and half of Middle Lane near Ch8.625 to Ch8.7; full width near Ch8.7 to Ch9.05
6,000 425 2.85 07/2025 10/2025 08/HY2021
Penny's Bay Highway, South Bound
Full width near L/P DC0867 to L/P DC0839
14,000 800 6.09 08/2025 10/2025 08/HY2021
Wo Yi Hop Road
(from L/P FA5999 to FA1716)
3,000 403 2.33 07/2025 03/2026 05/HY/2020
Route Twisk (between L/P no. FA5482 and L/P no.FA5503 4,300 280 5.67 08/2025 08/2026 05/HY/2020
Castle Peak Road – Lam Tei
(Section between L/P FA8099 and FB2252)
7,500 600 5.20 08/2025 03/2026 04/HY/2020
Castle Peak Road – Lam Tei
(Section between L/P FB2249 and FB5864)
6,500 600 5.00 08/2025 03/2026 04/HY/2020
Hung Hom Bypass Northbound fast and slow lane(between L/P AB4938 and BB2296) 4,300 460 3.80 09/2025 08/2026 12/HY/2019
Hoi Wang Road Southbound between Yan Cheung Road and Jordan Road 4,500 284 3.60 08/2025 11/2026 12/HY/2019
Ching Cheung Road Section between L/P AB0875 & L/P CF0317 4,800 600 3.10 07/2025 10/2025 12/HY/2019
Hung Hom Bypass Northbound fast and slow lane(between L/P AB4938 and BB2296) 4,300 460 3.80 09/2025 08/2026 02/HY/2023