Road Resurfacing Works under Construction

(as at 30 June 2026)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Actual
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
Contract
No.
Castle Peak Road – Lam Tei
(Section between L/P FA8099 and FB2252)
3,300 250 2.20 04/2026 09/2027 03/HY/2025
Castle Peak Road – Lam Tei
(Section between L/P FB2249 and FB5864)
4,000 350 3.00 04/2026 09/2027 03/HY/2025
Cold Milling & Resurfacing of Flexible Carriageway with Highly Modified Stone Mastic Asphalt 10 (HMSMA10) at Cheung Yee Street between Cheung Mou Street & Tai Nan West Street 2,400 250 2.20 10/2025 09/2026 12/HY/2019
Cold Milling & Resurfacing with Highly Modified Friction Course (HMFC) at West Kowloon Corridor (East Bound) Section between Hing Wah Street & Tonkin Street 5,400 600 3.40 10/2025 09/2027 12/HY/2019
Cold Milling & Resurfacing with Highly Modified Stone Mastic Asphalt (HMSMA6) at Tonkin Street (South Bound) Section between Un Chau Street & Cheung Sha Wan Road 2,000 200 1.60 10/2025 08/2026 12/HY/2019
Hoi Bun Road from Kei Yip Street to Cheung Yip Street 13,500 1,300 6.84 01/2024 12/2026 02/HY/2023
Hoi Wang Road Southbound between Yan Cheung Road and Jordan Road 4,500 284 3.60 08/2025 11/2026 12/HY/2019
Hung Hom Bypass Northbound fast and slow lane(between L/P AB4938 and BB2296) 4,300 460 3.80 09/2025 08/2026 12/HY/2019
Kwai Shing Circuit from Tai Wo Hau Road to Kwai Luen Road (between L/P FA9784 and FA9800) 4,950 440 2.46 10/2025 09/2026 05/HY/2020
Repair Anti-Skid Surface Dressing at West Kowloon Corridor near between L/P AA9411 & AA9206 3,800 500 2.15 10/2025 03/2027 12/HY/2019
Resurfacing of Flexible Carriageway with Bituminous Materials at Cheung Fat Street Section between L/P GF3294 & AA3259 2,400 250 1.51 01/2026 08/2026 12/HY/2019
Route Twisk (between L/P no. FA5482 and L/P no.FA5503 4,300 280 5.67 08/2025 08/2026 05/HY/2020
Sha Tsui Road
(between L/P FA1771 and FA1804, Eastbound)
2,000 300 1.20 12/2025 08/2026 05/HY/2020
So Kwun Wat Road, Tuen Mun
(Both Bound Between L/P AD7326 and AJ0318)
6,000 700 3.00 10/2025 09/2026 03/HY/2025
TOLO HIGHWAY (I) NORTH BOUND, CH18.10 TO CH18.26, FULL WIDTH; AND (II) NORTH BOUND, CH18.26 TO CH18.51, HARD SHOULDER, LANE 1 AND LANE 2; AND (III) NORTH BOUND, CH18.51 TO CH18.72, FULL WIDTH 10,500 600 3.40 05/2026 07/2026 15/HY/2024
Tuen Mun Heung Sze Wui Road
(i) Between Pui To Road and Tsing Yin Street
(ii) near Hoi Chu Road
4,200 400 2.50 09/2024 12/2026 03/HY/2025
Tuen Mun Road (A Bound)
Ch 66.8 to Ch 66.4 & Ch 66.325 to Ch 66.0, Full Width
Ch 66.4 to Ch 66.325, Slow Lane
12,000 800 5.50 04/2026 09/2026 08/HY/2021
Wai Yip Street Westbound from Lai Yip Street to Shun Yip Street and Lai Yip Street from Hoi Bun Road to Kwun Tong Road 8,000 900 3.04 03/2026 12/2027 02/HY/2023
Wang Pok Street J/O Yuen Wo Road 2,000 150 1.00 04/2026 09/2026 03/HY/2023