24-hour Hotline 2926 4111

Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road

Project Description:

The proposed "Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road" is a "Hillside Escalator Link and Elevator System". The Project aims to improve the accessibility of the residential areas, the community facilities and the transport facilities between the uphill areas and Ma On Shan town centre. It will provide a comfortable, convenient, safe and barrier-free pedestrian access to the public (in particular the elderly and the disabled).

Estimated Project Cost: :

HK$141.1 Million

Construction Commencement Date:

October 2022

Anticipated Commissioning Date:

4th quarter of 2025

Contract(s):

Contract No. HY/2022/07

Scope
  1. construction of a lift tower with two lifts;
  2. construction of a covered elevated pedestrian link connecting the lift tower and Saddle Ridge Garden; and
  3. associated works including footpath widening, geotechnical, road and drainage, electrical and mechanical, landscaping and public lighting works.
Commencement
Date
October 2022
Anticipated Completion Date Q4 2025
Contract Sum HK$98.66 Million
Contractor Wing Hing Construction Company Limited
Resident Engineer Mannings (Asia) Consultants Limited

Consultant:

Mannings (Asia) Consultants Limited

Other Related Information: