Skip to content Skip to menu Skip to search box
Brand Hong Kong
GovHK 香港政府一站通
English繁體版简体版
Level Double-A conformance, W3C WAI Web Content Accessibility Guidelines 2.0HKQAA ISO 9001 Certification MarkHKQAA ISO 14001 Certification MarkWeb Accessibility Recognition Scheme

Invitation for Expression of Interest

 

Invitation Published Date Invitation Closing Date Consultancy Agreement No.
and Consultancy Title
Invitation Documents
pdf format PDF file format
There is no outstanding invitation at the moment

Closed Invitation for Expression of Interest

Invitation Published Date Invitation Closing Date Consultancy Agreement No.
and Consultancy Title
Invitation Documents
pdf format PDF file format
22 March 2019
12:00 noon on
4 April 2019


Agreement No. CE 68/2018 (HY)
Pedestrian Link between Po Lam Road North and Po Hong Road, Tseung Kwan O– Investigation
30 November 2018
12:00 noon on

14 December 2018

Agreement No. CE 64/2018 (HY)
Lift and Pedestrian Walkway Systems between Saddle Ridge Garden and Sai Sha Road and between Hing Shing Road and Tai Wo Hau Road – Investigation
26 November 2018
12:00 noon on

14 December 2018

Agreement No. CE 46/2018 (HY)
Road Works in Connection with Proposed Housing / Commercial Development on Eight Sites (Package 2A) - Feasibility Study
23 November 2018
12:00 noon on

14 December 2018

Agreement No. CE 44/2018 (GE)
Preventive Maintenance Programme (2019 – 2023) Upgrading/Improvement of Roadside Man-made Slopes/Retaining Walls in New Territories - Investigation, Design and Construction
23 November 2018
12:00 noon on

14 December 2018

Agreement No. CE 61/2018 (HY)
Widening of Tsuen Wan Road, extension of existing vehicular bridge at Texaco Road and the associated junction improvement works – Investigation
12 October 2018
12:00 noon on

26 October 2018

Agreement No. CE 52/2018 (HY)
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 5 - Investigation, Design and Construction

Agreement No. CE 53/2018 (HY)
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 6 - Investigation, Design and Construction

Agreement No. CE 54/2018 (HY)
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 7 - Investigation, Design and Construction

19 September 2018
12:00 noon on

5 October 2018

Agreement No. CE 48/2018 (HY)
Improvement of Lion Rock Tunnel - Investigation

3 August 2018
12:00 noon on

17 August 2018

Agreement No. CE 37/2018 (HY)
Study on Separating Light Rail System and Roads/Footpaths at Selected Road Junctions – Feasibility Study

13 July 2018
12:00 noon on

10 August 2018

Agreement No. CE 1/2018 (CE)
Strategic Study on Railways beyond 2030 – Feasibility Study

14 May 2018
12:00 noon on

29 May 2018

Agreement No. CE 18/2018 (HY)
Retrofitting of Noise Barriers on Po Lam Road North and Po Ning Road - Investigation, Design and Construction

23 March 2018
12:00 noon on

13 April 2018

Agreement No. CE 87/2017(GE)
Roadside Slope Engineer Inspections (2018-2023) in Urban Region - Investigation

2 February 2018
12:00 noon on

23 February 2018

Agreement No. CE 91/2017 (HY)
Extension of Footbridge Network in Tsuen Wan – Footbridge B along Tai Chung Road and Hoi Shing Road – Design and Construction

26 January 2018
12:00 noon on

9 February 2018

Agreement No. CE 94/2017 (HY)
Review on the feasibility of Pedestrian Subway System in Causeway Bay – Feasibility Study

5 January 2018
12:00 noon on

26 January 2018

Agreement No. CE 76/2017 (HY)
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road - Investigation

22 December 2017
12:00 noon on

15 January 2018

Agreement No. CE 70/2017 (HY)
Review of Potential Roadside Safety Hazards in the Hong Kong Road Network – Investigation

21 December 2017
12:00 noon on

16 January 2018

Agreement No. CE 55/2017 (HY)
Feasibility Review for Retrofitting Barrier-free Access Facilities at Grade-Separated Walkways - Feasibility Study

13 October 2017
12:00 noon on

30 October 2017

Agreement No. CE 28/2017 (HY)
Pedestrian Link near Chuk Yuen North Estate - Design and Construction

15 September 2017
12:00 noon on

6 October 2017

Agreement No. CE 41/2017 (HY)
Proposed Pedestrian Footbridge System in Mong Kok - Design and Construction

18 August 2017
12:00 noon on

4 September 2017

Agreement No. CE 29/2017 (HY)
Braemar Hill Pedestrian Link
- Design and Construction

14 July 2017
12:00 noon on

28 July 2017

Agreement No. CE 10/2017 (HY)
Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung - Design and Construction

23 June 2017
12:00 noon on

14 July 2017

Agreement No. CE 26/2017 (HY)
Proposed Pedestrian Environment Improvement Works in Kwun Tong Business Area - Ngau Tau Kok Portion Investigation

5 June 2017
12:00 noon on

19 June 2017

Agreement No. CE18/2017 (HY)
Retrofitting of Noise Barriers on Long Tin Road and Ma Wang Road - Investigation, Design and Construction

31 May 2017
12:00 noon on

14 June 2017

Agreement No. CE 65/2016 (HY)
Further Study on Tuen Mun Western Bypass – Investigation

26 May 2017
12:00 noon on

9 June 2017

Agreement No. CE 14/2017 (HY)
Provision of Universal Accessibility Facilities at
Footbridges, Elevated Walkways and Subways Package 3 - Investigation, Design and Construction

Agreement No. CE 15/2017 (HY)
Provision of Universal Accessibility Facilities at
Footbridges, Elevated Walkways and Subways Package 4 - Investigation, Design and Construction

26 January 2017
12:00 noon on
20 February 2017

Agreement No. CE 51/2016 (HY)
Route 11 (between North Lantau and Yuen Long) – Feasibility Study

 

4 January 2017
12:00 noon on
25 January 2017
Agreement No. CE 57/2016 (HY)
Lift and Pedestrian Walkway System between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung - Design and Construction

 

29 December 2016
12:00 noon on
13 January 2017

Agreement No. CE 53/2016 (HY)
Shatin to Central Link (SCL) Professional Services in connection with the Service Concession for the Operation of the SCL - Investigation

 

28 October 2016
12:00 noon on
11 November 2016

Agreement No. CE 44/2016 (HY)
Condition Survey and Principal Inspection of Tate’s Cairn Tunnel - Investigation

 

13 July 2016
12:00 noon on
27 July 2016

Agreement No. CE 19/2016 (HY)
Hong Kong section of Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL) Engineering Professional Services in connection with the Service Concession for the Operation of the XRL - Investigation

 

3 June 2016
12:00 noon on
24 June 2016
Agreement No. CE 20/2016 (GE)
Roadside Slope Engineer Inspections (2016-2021) in NT Region – Investigation

 

28 April 2016
12:00 noon on
20 May 2016
Agreement No. CE 2/2016 (HY)
Principal Inspection of Shing Mun Tunnel and Tseung Kwan O Tunnel and Associated Studies - Investigation

 

11 March 2016
12:00 noon on
1 April 2016
Agreement No. CE 73/2015 (HY)
Proposed Footbridge near Kowloon Bay MTR Station Exit B - Investigation, Design and Construction

 

26 February 2016
12:00 noon on
11 March 2016
Agreement No. HMW 2/2016 (TT)
Traffic Review and Improvement Schemes at Tsuen Wan Road and Associated Junctions

 

2 February 2016
12:00 noon on
26 February 2016
Agreement No. CE 72/2015 (HY)
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road - Design and Construction
29 October 2015
12:00 noon on
20 November 2015
Agreement No. CE 60/2015 (HY)
Lift and Pedestrian Walkway System between Kwai Shing Circuit and Hing Shing Road, Kwai Chung - Design and Construction

 

15 October 2015
12:00 noon on
6 November 2015
Agreement No. CE 57/2015 (HY)
Road Works in Connection with Proposed Sites for Housing / Commercial Development (Package 1) - Feasibility Study

 

21 August 2015
12:00 noon on
11 September 2015
Agreement No. CE 30/2015 (HY)
Principal Inspection of Lion Rock Tunnel and Associated Studies - Investigation

 

23 April 2015
12:00 noon on
15 May 2015
Agreement No. CE 8/2013 (GE)
Preventive Maintenance Programme (2015 – 2020) of Roadside Man-made Slopes/Retaining Walls in Urban Region - Investigation, Design and Construction

 

30 January 2015
12:00 noon on
27 February 2015
Agreement No. CE 75/2014 (HY)
Lift and Pedestrian Walkway Systems at
Wo Tong Tsui Street, Kwai Chung and
Luen On Street, Kwun Tong - Investigation

 

14 January 2015
12:00 noon on
30 January 2015
Agreement No. CE 74/2014 (HY)
Braemar Hill Pedestrian Link - Investigation

 

17 October 2014
12:00 noon on
24 October 2014
Agreement No. CE 43/2014 (HY)
Condition Survey of Eastern Harbour Crossing - Investigation

 

26 September 2014
12:00 noon on
17 October 2014
Agreement No. CE 38/2014 (HY)
Principal Inspection of Aberdeen Tunnel and Associated Studies - Investigation
29 July 2014
12:00 noon on
22 August 2014
Agreement No. CE 32/2014 (HY)
Elevated Pedestrian Corridor in Yuen Long Town connecting with Long Ping Station - Investigation, Design and Construction
20 December 2013
12:00 noon on
10 January 2014

Agreement No. CE 46/2013 (HY)
Lift and Pedestrian Walkway Systems at Hing Shing Road, Kung Yip Street, Lai Cho Road and Chuk Yuen North Estate - Investigation

11 October 2013
12:00 noon on
1 November 2013

Agreement No. WD 14/2013
New Wang Tong River Bridge
Environmental Impact Assessment and Drainage Impact Assessment Studies

18 September 2013
12:00 noon on
15 October 2013

Agreement No. CE 51/2013 (HY)
Widening of Western Section and Eastern Section of Lin Ma Hang Road - Design and Construction

23 August 2013
12:00 noon on
13 September 2013

Agreement No. CE 39/2013 (HY)
Provision of Barrier-free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 5) - Design and Construction

Agreement No. CE 40/2013 (HY)
Provision of Barrier-free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 6) - Design and Construction

16 August 2013
12:00 noon on
6 September 2013

Agreement No. CE 23/2013 (HY)
Principal Inspection of Cross-Harbour Tunnel and Associated Studies - Investigation

25 June 2013
12:00 noon on
16 July 2013

Agreement No. CE 21/2013 (HY)
Proposed Pedestrian Footbridge System in Mong Kok – Investigation

21 June 2013
12:00 noon on
4 July 2013

Agreement No. CE 17/2013 (HY)
Widening of Castle Peak Road – Castle Peak Bay – Design and Construction

5 April 2013
12:00 noon on
3 May 2013

Agreement No. CE 10/2013 (EP)
Detailed Study of the Marine Park in the Brothers Islands - Design and Construction

28 March 2013
12:00 noon on
19 April 2013

Agreement No. CE 7/2013 (GE)
Roadside Slope Engineer Inspections (2013 – 2018) in Urban Region – Investigation

21 March 2013
12:00 noon on
11 April 2013

Agreement No. CE 61/2012 (HY)
Improvement to Fan Kam Road – Investigation

21 December 2012
12:00 noon on
9 January 2013

Agreement No. CE 18/2011 (GE)
Preventive Maintenance Programme (2013 – 2018) of Roadside Man-made Slopes/Retaining Walls in New Territories – Investigation, Design and Construction

7 September 2012
12:00 noon on
21 September 2012
Agreement No. CE 45/2012 (HY)
NEC Contract Administration Services for Improvement to Pok Oi Interchange – Design and Construction
20 July 2012
12:00 noon on
10 August 2012
Agreement No. CE 41/2012 (HY)
Provision of Barrier-free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 4) - Design and Construction
29 May 2012
12:00 noon on
11 June 2012
Agreement No. CE 22/2012 (HY)

Retrofitting of Noise Barriers on Tuen Mun Road (Town Centre and Fu Tei Sections) – Design and Construction

10 April 2012
12:00 noon on
26 April 2012
Agreement No. CE 7/2012 (HY)
Shatin to Central Link (SCL)
Monitoring and Verification for Construction, Testing and Commissioning Phase – Investigation
30 March 2012
12:00 noon on
20 April 2012
Agreement No. CE 4/2012 (GE)
Preventive Maintenance Programme (2012 – 2017) of Roadside Man-made Slopes/Retaining Walls in Hong Kong Island - Investigation, Design and Construction
13 March 2012
12:00 noon on
30 March 2012
Agreement No. CE 5/2012 (HY)
Widening of 2 Sections of Lin Ma Hang Road (Sections between Ping Yuen River and Ping Che Road and between Tsung Yuen Ha and Lin Ma Hang) – Investigation
10 February 2012
12:00 noon on
2 March 2012
Agreement No. CE 2/2012 (HY)
Escalator Link and Pedestrian Walkway System at Pound Lane and Lift System and Pedestrian Walkways at Cheung Hang Estate, Tsing Yi - Investigation
27 January 2012
12:00 noon on
16 February 2012
Agreement No. CE 58/2011 (HY)
Widening of Castle Peak Road – Castle Peak Bay – Investigation
30 December 2011
12:00 noon on
27 January 2012
Agreement No. CE 49/2011 (HY) - Dualling of Hiram’s Highway between Clear Water Bay Road and Marina Cove and Improvement to Local Access to Ho Chung - Design and Construction
30 December 2011
12:00 noon on
20 January 2012
Agreement No. CE 53/2011 (HY) - Provision of Barrier-free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 3) - Design and Construction
9 November 2011
12:00 noon on
25 November 2011
Agreement No. CE 48/2011 (EP) - Environmental Project Office for the Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road, Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities, & Tuen Mun – Chek Lap Kok Link - Investigation
19 October 2011
12:00 noon on
2 November 2011
Agreement No. CE 44/2011 (HY) - Proposed Road Improvement Works in West Kowloon Reclamation Development – Phase 1 – Investigation, Design and Construction
29 July 2011
12:00 noon on
12 August 2011
Agreement No. CE 37/2011 (HY) - Provision of Barrier-Free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 2) - Design and Construction
28 July 2011
12:00 noon on
12 August 2011
Agreement No. CE 31/2011 (HY) - Provision of Barrier-Free Access Facilities at Public Footbridges, Elevated Walkways and Subways Phase 3 (Package 1) - Design and Construction
22 July 2011
12:00 noon on
12 August 2011
Agreement No. CE 36/2011 (HY) - Further Study and Preliminary Design for Improvement of Hiram's Highway from Marina Cove to Sai Kung Town - Investigation
3 June 2011
12:00 noon on
24 June 2011
Agreement No. CE 5/2011 (HY) - Retrofitting of Noise Barriers on San Tin Highway - Investigation
19 April 2011
12:00 noon on
13 May 2011
Agreement No. CE 4/2011 (HY) - Improvements to Pedestrian Environment in Yuen Long Town - Feasibility Study
18 March 2011
12:00 noon on
1 April 2011

Agreement No. CE 36/2010 (HY)
Retrofitting of Noise Barriers on Tuen Mun Road (Town Centre and Fu Tei Sections) – Investigation

23 February 2011
12:00 noon on
16 March 2011
Agreement No. CE 34/2010 (EP)
Environmental Project Office for the Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road,
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities, & Tuen Mun – Chek Lap Kok Link – Investigation
18 February 2011
12:00 noon on
11 March 2011
Agreement No. CE 7/2011 (HY)
Tuen Mun – Chek Lap Kok Link – Design and Construction
10 December 2010
12:00 noon on
7 January 2011
Agreement No. CE 43/2010 (HY)
Central Kowloon Route – Design and Construction
6 December 2010
12:00 noon on
24 December 2010
Agreement No. CE 14/2010 (GE)
Roadside Slope Engineer Inspections (2011-2015) in NT Region – Investigation
17 Nov 2010
12:00 noon on
3 December 2010
Agreement No. CE 35/2010 (CE)
Review and Update of the Second Railway Development Study – Feasibility Study
16 Nov 2010
12:00 noon on
30 November 2010
Agreement No. WD 11/2010
Improvement to Pok Oi Interchange Advisory Services on New Engineering Contract
28 Oct 2010
12:00 noon on
12 November 2010
Agreement No. CE 26/2010 (HY)
Pedestrian Subways in Causeway Bay - Feasibility Study
18 Aug 2010
12:00 noon on
25 August 2010
Agreement No. CE 25/2010 (HY)
Shatin to Central Link (SCL) - Independent Design Review, Checking of Project Cost and Cost Apportionment for Design and Site Investigation Phase – Investigation
9 Jul 2010
12:00 noon on
13 August 2010
Agreement No. CE 13/2010 (CE)
Hong Kong–Zhuhai–Macao Bridge
Hong Kong Boundary Crossing Facilities (Superstructures and Infrastructures) – Design and Construction
30 Apr 2010
12:00 noon on
14 May 2010
Agreement No. CE 8/2010 (HY)
Hong Kong Section of Guangzhou -Shenzhen-Hong Kong Express Rail Link (XRL) Monitoring and Verification for Construction, Testing and Commissioning Phase - Investigation
12 Feb 2010
12:00 noon on
5 March 2010
Agreement No. CE 60/2009(HY)
Provision of Access Facilities for the Disabled at Existing Footbridges and Subways in New Territories, Phase 3 – Investigation
18 Jan 2010
12:00 noon on
1 February 2010
Agreement No. CE 35/2009 (HY) Investigation for Elevated Walkway System along Gloucester Road
16 Dec 2009
12:00 noon on
30 December 2009
Agreement No. CE 38/2009(HY)
Provision of Access Facilities for the Disabled at Existing Footbridges and Subways in Urban Area, Phase 3 – Investigation
1 Dec 2009
12:00 noon on
15 December 2009
CE 36/2009 (HY)
Tender and Construction of Hong Kong - Zhuhai - Macao Bridge (HZMB)
Hong Kong Link Road (HKLR) - Design and Construction
30 Oct 2009
12:00 noon on
13 November 2009
CE 50/2009 (HY)
Study on the Use of Eurocodes for Highway Structures and Updating of Structures Design Manual for Highways and Railways – Investigation
9 Oct 2009
12:00 noon on
19 October 2009
WD 10/2009
Improvement and Extension of Kam Pok Road - Design
15 Jun 2009
12:00 noon on
26 June 2009
CE 28/2009(CE)
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities (Reclamation Works) - Design and Construction
22 May 2009
12:00 noon on
8 June 2009
HL 1/2009(HY)
Rehabilitation of Aged and Dilapidated Road Light Systems at Flyovers Preliminary Design, Traffic Impact Assessment and Environmental Study
14 May 2009
12:00 noon on
29 May 2009
CE 14/2009 (EM)
Independent Design Review of the Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link
Electrical and Mechanical Systems – Investigation
7 April 2009
12:00 noon on
24 Apr 2009
CE 7/2009 (HY)
Independent Checking of the Funding Arrangement of the South Island Line (East) - Investigation
26 Mar 2009
12:00 noon on
9 Apr 2009
CE 6/2009 (HY)
Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link
Monitoring and Verification for Design and Site Investigation Phase - Design and Construction
9 Sep 2008
12:00 noon on
3 Oct 2008
CE 39/2008 (HY)
Retrofitting of Noise Barriers on 13 Existing Road Sections - Feasibility Study
23 May 2008
12:00 noon on
20 Jun 2008
CE 22/2008 (HY)
Retrofitting of Noise Barriers on Tai Po Road (Sha Tin Section) and Other Road Sections in Sha Tin - Investigation, Design and Construction
3 June 2008
12:00 noon on
13 Jun 2008
WD 9/2008
Improvement and Extension of Kam Pok Road - Investigation
23 May 2008
12:00 noon on
6 Jun 2008
CE 25/2008 (HY)
Further Landscape Enhancement to North Lantau Highway -
Design and Construction
25 Mar 2008
12:00 noon on
8 Apr 2008
CE 14/2008 (CE)
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities - Investigation
4 Mar 2008
12:00 noon on
25 Mar 2008
CE 37/2007 (HY)
Water Carrying Services Affecting the Safety of Slope Features in the New Territories – Investigation
31 Jan 2008
12:00 noon on
22 Feb 2008
CE 53/2007 (HY)
Tuen Mun Western Bypass – Investigation
15 Jan 2008
12:00 noon on
31 Jan 2008
CE 52/2007 (HY)
Tuen Mun – Chek Lap Kok Link – Investigation
31 Dec 2007
12:00 noon on
18 Jan 2008
BSTR 1/2007(HY)
Advice on the Use of Eurocodes in Hong Kong – Feasibility Study
17 Dec 2007
12:00 noon on
4 Jan 2008
CE 59/2007 (GE)
Roadside Slope Engineer Inspections (2008-2013) in Urban Region – Investigation
11 Dec 2007
12:00 noon on
24 Dec 2007
WD 7/2007
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road – Environmental Impact Assessment Study
11 Dec 2007
12:00 noon on
24 Dec 2007
WD 8/2007
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road – Drainage Impact Assessment and Traffic Impact Assessment Study
31 Oct 2007
12:00 noon on
23 Nov 2007
CE 48/2007 (HY)
Retrofitting of Noise Barriers on Tai Po Tai Wo Road - Investigation, Design and Construction
28 Sep 2007
12:00 noon on
26 Oct 2007
CE 26/2007 (HY)
Pavement Condition Survey Stage 2 for Roads in Kowloon – Investigation
27 Sep 2007
12:00 noon on
18 Oct 2007
CE 42/2007 (HY)
Retrofitting of Noise Barriers on Sha Tin Road - Investigation, Design and Construction
12 Sep 2007
12:00 noon on
3 Oct 2007
CE 33/2007 (HY)
Provision of Access Facilities for the Disabled at Existing Footbridges Phase 2 and Existing Subways Phase 1 - Investigation
6 Sep 2007
12:00 noon on
2 Oct 2007
CE 32/2007 (HY)
Pavement Condition Survey Stage 2 for Roads in New Territories - Investigation
28 Aug 2007
12:00 noon on
14 Sept 2007
CE 36/2007 (HY)
Study on Containment Levels and Selection Criteria of Roadside Barriers - Feasibility Study
20 July 2007
12:00 noon on
31 July 2007
WD 6/2007
Improvement to Pok Oi Interchange - Environment Impact Assessment Study
26 June 2007
12:00 noon on
6 July 2007
WD 5/2007
Tseung Kwan O Further Development
Infrastructure Works for TKO Stage I Landfill Site - Study on Impact to Environment, Drainage System and Stability of Existing Seawall
3 May 2007
12:00 noon on
25 May 2007
CE 18/2007 (HY)
Retrofitting of Noise Barriers on Fanling Highway (Po Shek Wu Road to East Rail Fanling Station and East Rail Fanling Station to Wo Hing Road)
- Investigation, Design and Construction
30 Apr 2007
12:00 noon on
18 May 2007
CE 13/2007(EP)
Low Noise Surfacing on Local Roads (Phase IV) - Investigation
30 Apr 2007
12:00 noon on
14 May 2007
CE 19/2007 (HY)
Hiram’s Highway Improvement Stage 2 - Investigation
23 Mar 2007
12:00 noon on
20 April 2007
CE 25/2005 (HY) - Rehabilitation and Improvement Works at Lion Rock Tunnel – Design and Construction
24 Nov 2006
12:00 noon on
15 December 2006
CE 58/2006 (HY) - Central Kowloon Route and Widening of Gascoigne Road Flyover – Investigation
1 Dec 2006
12:00 noon on
11 December 2006
WD 4/2006 - Retrofitting of Noise Barrier on Yuen Shin Road, Tai Po – Environmental Review, Geotechnical Appraisal and Traffic Impact Assessment Study
25 August 2006
12:00 noon on
15 September 2006
CE 40/2006 (HY) - Tsing Yi Lantau Link – Feasibility Study
27 June 2006
12:00 noon on
11 July 2006
CE 21/2006 (GE) - Upgrading/Improvement of Roadside Man-made Slopes/Retaining Walls
in Urban Region – 2006 to 2010 Programme (Package II) – Investigation, Design and Construction
13 June 2006
12:00 noon on
28 June 2006
CE 20/2006 (GE) - Upgrading/Improvement of Roadside Man-made Slopes/Retaining Walls in Urban Region – 2006 to 2010 Programme (Package I) – Investigation, Design and Construction
26 January 2006
12:00 noon on
17 February 2006
CE 4/2006 (HY) - Retrofitting of Noise Barriers on Tseung Kwan O Road, Tsing Tsuen Bridge and Kwun Tong Bypass - Investigation, Design and Construction
20 September 2005
12:00 noon on
10 October 2005
CE 45/2005 (HY) - Link Options between Tuen Mun and Lantau - Feasibility Study
31 August 2005
12:00 noon on
15 September 2005
WD 1/2005 - Further Study on Dualling of Hiram’s Highway between Clear Water Bay Road and Marina Cove and Improvement to Local Access to Ho Chung
24 August 2005
12:00 noon on
9 September 2005
CE 38/2005 (HY) - Traffic Improvements to Tuen Mun Road Town Centre Section - Feasibility Study
7 July 2005
12:00 noon on
5 August 2005
CE 24/2005 (HY) - Structural Integrity of Shing Mun Tunnels and Tseung Kwan O Tunnel – Investigation
30 June 2005
12:00 noon on
18 July 2005
CE 28/2005 (HY) - Tuen Mun Chek Lap Kok Link and Tuen Mun Eastern Bypass - Feasibility Study
10 June 2005
12:00 noon on
5 July 2005
CE 16/2005 (GE) - Roadside Slope Engineer Inspections (2006-2010) in NT Region - Investigation
27 May 2005
12:00 noon on
17 June 2005
CE 22/2005 (HY) - Reconstruction and Improvement of Tuen Mun Road - Design and Construction
26 April 2005
12:00 noon on
13 May 2005
RND 01/05 - Prevention of Gas explosion in Utility Manhole
1 April 2005
12:00 noon on
21 April 2005
CE 11/2005 (HY) - Tuen Mun Eastern
Bypass - Feasibility Study
18 March 2005
12:00 noon on
1 April 2005
HKR 1/2005 - Loading/Unloading Facilities for Stubbs Road Lookout - Feasibility Study
9 March 2005
12:00 noon on
30 March 2005
CE 32/2004 (GE) - Upgrading/Improvement of Roadside Slopes/Retaining Walls
on Hong Kong Island (2005 to 2008 Programme) – Investigation, Design and Construction
Download Adobe Acrobat Reader and Acrobat Chinese Language Support for viewing and printing PDF documents.