Consultancies Awarded in Past 12 Months

July 2025 to June 2026

Agreement
No.
Agreement Title Award Date
(dd/mm/yyyy)
Contractor
Name
Type of
Consultancy
Agreement
Consultancy
Fee
($M)
CE 25/2025 (HY) Tsing Lung Bridge – Design and Construction (NEC PSC Option A) 16/6/2026 Arup – Mott MacDonald Joint Venture D&C 108.000
CE 41/2025 (HY) Northern Metropolis Highway (San Tin Section) – Design and Construction (NEC4 PSC Option A) 2/6/2026 AECOM Asia Company Limited - AtkinsRealis Asia Limited Joint Venture D&C 105.881
CE 35/2025 (CE) Professional Support for Implementation of Building Control Mechanism for Projects of Cross-boundary Railways and Smart and Green Mass Transit Systems – Investigation (NEC4 PSC Option A) 13/02/2026 David S. K. Au - SMEDI Joint Venture I 6.495
CE 32/2025 (CE) Independent Checking of the Financial Arrangement of Part 2 of the Northern Link Project – Investigation (NEC4 PSC Option A) 29/12/2025 PYPUN Engineering Consultants Limited I 8.998
CE 36/2024 (HY) Principal Inspection of Lion Rock Tunnel and Associated Studies – Investigation (NEC3 PSC Option A) 22/09/2025 Wings & Associates Consulting Engineers Limited I 7.190