24-hour Hotline 2926 4111

Tseung Kwan O Line

Tseung Kwan O Line

Tseung Kwan O Line connects Po Lam at Tseung Kwan O with North Point on Hong Kong Island. It comprises the Quarry Bay Congestion Relief Scheme opened in September 2001, and the Tseung Kwan O Extension opened in August 2002. The former provides a new connection between Quarry Bay and North Point whereas the latter extends the railway to serve the Tseung Kwan O New Town. Tseung Kwan O Line is 10.7 km long between the 2 terminal stations at North Point and Po Lam with 5 intermediate stations; namely Quarry Bay, Yau Tong, Tiu Keng Leng, Tseung Kwan O and Hang Hau. North Point and Quarry Bay are the interchange stations with Island Line. Yau Tong and Tiu Keng Leng are the interchange stations with Kwun Tong Line.

The newly constructed LOHAS Park Station is situated in Tseung Kwan O Area 86 adjacent to the existing Tseung Kwan O Depot. The construction works for the station commenced in 2006 and completed in 2009. The LOHAS Park Station officially opened for passenger services on 26 July 2009. The Tseung Kwan O Line train service bifurcates at Tseung Kwan O Station with trains running south to LOHAS Park Station, as well as north to Po Lam Station via Hang Hau Station.