Road Resurfacing Works under Planning

(as at 30 September 2025)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Anticipated
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
i) Tolo Highway, B Bound near CH9.68 Slip to Chak Cheung Street Round-about, Full Width and ii) Tate’s Cairn Highway, North Bound, near CH18.46 Slip Road to Chak Cheung Street Round-about. 4,500 520 2.40 11/2025 02/2026
Wan Po Road,section between AE1489 and CE1406 5,200 750 4.25 11/2025 02/2026
Wan Po Road,section between AF4016 and AF4012 640 140 0.51 10/2025 10/2025
Tai Po Road - Sha Tin Height
(from L/P N6938 to N6956)
5,000 550 1.60 12/2025 07/2026
Kwai Shing Circuit from Tai Wo Hau Road to Kwai Luen Road (between L/P FA9784 and FA9800) 4,950 440 2.46 10/2025 03/2026
Sha Tsui Road
(between L/P FA1771 and FA1804, Eastbound)
2,000 300 1.20 12/2025 05/2026
Kwun Tong Road Roundabout 2,200 250 0.83 10/2025 12/2025
Po Shek Wu Road between L/P AD2642 and N1705 5,710 450 3.57 11/2025 01/2026
Tai Po Road - Tai Wai J/O Lion Rock Tunnel Road 3,000 180 2.00 11/2025 05/2026
So Kwun Wat Road, Tuen Mun
(Both Bound Between L/P AD7326 and AJ0318)
6,000 700 3.00 10/2025 03/2026
Lung Kwu Tan Road (Section between L/P AJ0045 and AJ0063) 6,000 700 1.50 10/2025 06/2026
Tin Wan Street (between L/P 40469 and 41187) 780 270 2.35 11/2025 12/2025
Repair Anti-Skid Surface Dressing at West Kowloon Corridor near between L/P AA9411 & AA9206 3,800 500 2.15 10/2025 03/2027
Cold Milling & Resurfacing of Flexible Carriageway with Highly Modified Stone Mastic Asphalt 10 (HMSMA10) at Cheung Yee Street between Cheung Mou Street & Tai Nan West Street 2,400 250 2.20 10/2025 09/2026
Cold Milling & Resurfacing with Highly Modified Stone Mastic Asphalt (HMSMA6) at Tonkin Street (South Bound) Section between Un Chau Street & Cheung Sha Wan Road 2,000 200 1.60 10/2025 08/2026
Cold Milling & Resurfacing with Highly Modified Friction Course (HMFC) at West Kowloon Corridor (East Bound) Section between Hing Wah Street & Tonkin Street 5,400 600 3.40 10/2025 09/2027
Resurfacing of Flexible Carriageway with Bituminous Materials at Cheung Fat Street Section between L/P GF3294 & AA3259 2,400 250 1.51 01/2026 08/2026
Cold Milling & Resurfacing of flexible carriageway with Highly Modified Stone Mastic Asphalt (HMSMA10) at Hing Wah Street West Section between L/P CF0090 & L/P CF0111 2,000 250 2.00 10/2025 11/2025