Provision of Pedestrian Walkway Facilities – Package 1



Layout Plans of Provision of Pedestrian Walkway Facilities – Package 1
Photomontage of Footbridge connecting Morse Park No.3 and No.4, Wong Tai Sin
Photomontage of Lift and pedestrian walkway system between Tai Loong Street and Wo Yi Hop Road, Kwai Chung

Contract No.

HY/2022/06

Scope:

  1. construction of a covered footbridge with two lift towers connecting Morse Park No. 3 and No. 4 in Wong Tai Sin District;
  2. construction of an elevated covered walkway with two lift towers connecting Wo Yi Hop Road and Tai Loong Street in Kwai Chung District; and
  3. ancillary works including associated road works, drainage, water works, geotechnical, utilities, electrical and mechanical, landscaping and street lighting works.

Commencement Date:

August 2022

Anticipated Completion Date:

Q3 2025

Contract Sum:

HK$139.97 Million

Contractor:

Kin Chiu Engineering Limited

Resident Engineer:

Mannings (Asia) Consultants Limited

Consultant:

Mannings (Asia) Consultants Limited

Other Related Information: