Extension of footbridge network in Tsuen Wan – Footbridge A along Tai Ho Road

Project Description:

The works involve construction of a footbridge of about 620m long to connect the MTR Tsuen Wan Station with the existing elevated walkway system near Castle Peak Road - Tsuen Wan Section at the north and Sha Tsui Road at the south.

Estimated Project Cost: :

HK$ 169 Million

Construction Commencement Date :

Mar 2009

Commissioning Date :

Apr 2013