Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Project Description:

The objective of the proposed works is to relieve the traffic congestion at the Kwai Tsing Interchange Upramp. The scope of works mainly comprises the construction of a single-lane vehicular bridge connecting Tsuen Wan Road southbound fast lane to Kwai Chung Road, widening of a section of Tsuen Wan Road southbound traffic lane between Kwai Tsing Interchange upramp and Kwai Chung Road, and other ancillary works.

Estimated Project Cost:

HK$472.0 Million

Construction Commencement Date:

June 2021

Anticipated Commissioning Date:

Mid-2025

Contract(s) :

Contract No. HY/2020/08

Scope To construct a single-lane vehicular bridge connecting Tsuen Wan Road southbound fast lane of Kwai Chung Road and widen a section of Tsuen Wan Road southbound traffic lane between Kwai Tsing Interchange upramp and Kwai Chung Road.
Commencement Date June 2021
Anticipated Completion Date Mid-2025
Contract Sum HK$306.6 Miliion
Contractor Peako Engineering Co. Limited
Resident Engineer WSP (Asia) Limited