Widening of Fuk Hang Tsuen Road (Between Castle Peak Road – Lam Tei and Fuk Hang Tsuen Lane)

Project Description:

The project is to improve and widen the section of Fuk Hang Tsuen Road between Castle Peak Road – Lam Tei and Fuk Hang Tsuen Lane. The scope of the project comprises widening of a section of the existing single two-lane carriageway of approximately 600 metres (m) long from 6.5m to 10.3m; widening of footpaths; provision of one layby and one roundabout.

Estimated Project Cost: :

HK$72.8 Million

Construction Commencement Date:

10/2022

Anticipated Commissioning Date:

First Quarter of 2025

Contract(s):

Contract No. HY/2022/05

Scope Widening of a section of the existing single two-lane carriageway of approximately 600 metres (m) long from 6.5m to 10.3m; widening of footpaths; provision of one layby and one roundabout.
Commencement Date October 2022
Anticipated Completion
Date
First Quarter of 2025
Contract Sum HK$56.90 Million
Contractor Smooth Gain Engineering Limited
Resident Engineer Works Division of Highways Department

Consultant:

Nil

Other Related Information: