Project Description:

The project mainly involves construction of elevated slip roads connecting Tsing Wun Road and Lung Fu Road (northbound and southbound) (hereinafter referred to as "Lung Fu Road Slip Roads"), and construction of a slip road between Hoi Wing Road westbound and Tuen Mun Road northbound (hereinafter referred to as "Hoi Wing Road Slip Road"). The overall objective is to improve the traffic conditions within Tuen Mun District.

Estimated Project Cost: :

Under study

Anticipated Construction Commencement Date:

Under study

Anticipated Commissioning Date:

Under study

Current Situation:

  • Investigation study is in progress
  • Environmental Protection Department approved the Environmental Impact Assessment Report without conditions on 23 June 2023

Consultant:

WSP (Asia) Limited

Other Related Information: