Extension Works to Major Roads in Tuen Mun

Project Description:

The project mainly involves construction of elevated slip roads connecting Tsing Wun Road and Lung Fu Road (northbound and southbound) (hereinafter referred to as "Lung Fu Road Slip Roads"), and construction of a slip road between Hoi Wing Road westbound and Tuen Mun Road northbound (hereinafter referred to as "Hoi Wing Road Slip Road"). The overall objective is to improve the traffic conditions within Tuen Mun District.

Estimated Project Cost: :

Under study

Anticipated Construction Commencement Date:

Mid 2024

Anticipated Commissioning Date:

To be completed between 2029 and 2031 in stages

Current Situation:

Investigation study is in progress

Consultant:

WSP (Asia) Limited