24-hour Hotline 2926 4111

Shatin to Central Link (Hung Hom to Admiralty Section)

Shatin to Central Link

With a total length of 17 km, the Shatin to Central Link (SCL) project consists of two sections. The 11-kilometre-long Tai Wai to Hung Hom Section, which runs to Kowloon East via Diamond Hill, links up the Ma On Shan Line and the West Rail Line at each end to form the East West Corridor, i.e. the Tuen Ma Line. The 6-kilometre-long Hung Hom to Admiralty Section extends the East Rail Line to Admiralty to form the North South Corridor. Construction works of the SCL commenced in July 2012 and the Tuen Ma Line was fully commissioned on 27 June 2021. It is anticipated that the Hung Hom to Admiralty Section would be commissioned in June to July 2022.

More information can be found in the MTRCL website.