聯合道行人天橋升降機是全港首個採用組裝合成建 築法建成的升降機設施。此方法有效提升施工效率 和工地安全,較傳統方法平均縮短約 6 個月的施工 時間。 The lift at Junction Road footbridge is the first lift constructed in Hong Kong using the Modular Integrated Construction method. This approach effectively enhances construction efficiency and site safety, reducing construction time by about six months compared with traditional methods. 聯合道行⼈天橋升降機 Lift at Junction Road footbridge 在現場安裝聯合道行⼈天橋的預製升降機組件 On-site installation of prefabricated lift tower modules for Junction Road footbridge 122 | 創新建設 Innovative Construction