Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung

Project Description:

To provide a comfortable, convenient, safe, environmentally friendly and barrier-free pedestrian access to the locals, facilitating the elderly and the disabled to travel between Shek Lei area, Castle Peak Road – Kwai Chung and Kung Yip Street.

Estimated Project Cost:

HK$584.4 Million

Construction Commencement Date :

December 2019

Anticipated Commissioning Date

2nd quarter of 2023

Contract(s):

Contract No. HY/2019/02

Scope To construct a lift and pedestrian walkway system connecting Shek Lei area, Castle Peak Road – Kwai Chung and Kung Yip Street
Anticipated Commencement
Date
December 2019
Anticipated Completion Date 2nd quarter of 2023
Contract Sum HK$284.09 Million
Contractor Build King Civil Engineering Limited
Resident Engineer WSP (Asia) Limited

 

Consultant:

WSP (Asia) Limited