Skip to content Skip to menu Skip to search box
Brand Hong Kong
GovHK 香港政府一站通
English繁體版简体版
Level Double-A conformance, W3C WAI Web Content Accessibility Guidelines 2.0HKQAA ISO 9001 Certification MarkHKQAA ISO 14001 Certification MarkWeb Accessibility Recognition Scheme

Footbridge Connecting Morse Park No.3 and No.4

Project Description:

The project is one of the initiatives for enhancing district facilities, which aims to provide a safe, comfortable and convenient pedestrian walkway system for enhancing the connectivity between Morse Park No.3 and No.4.

Estimated Project Cost:

Under Study

Anticipated Construction Commencement Date:

Under Study

Anticipated Commissioning Date:

Under Study

Current Situation:

Under detailed design stage

Consultant:

Mannings (Asia) Consultants Limited

Other Related Information: