Skip to content Skip to menu Skip to search box
Brand Hong Kong
GovHK 香港政府一站通
English繁體版简体版
Level Double-A conformance, W3C WAI Web Content Accessibility Guidelines 2.0HKQAA ISO 9001 Certification MarkHKQAA ISO 14001 Certification MarkWeb Accessibility Recognition Scheme

Extension Works to Major Roads in Tuen Mun

Project Description:

The project involves construction of elevated viaducts connecting Tsing Wun Road and Lung Fu Road (northbound and southbound), widening of an existing slip road connecting Tuen Mun Road (Town Centre Section) southbound to Wong Chu Road westbound and construction of an additional slip road between Hoi Wing Road westbound and Tuen Mun Road northbound. The overall objective is to improve the traffic conditions within Tuen Mun District.

Estimated Project Cost: :

Under study

Anticipated Construction Commencement Date:

Mid 2024

Anticipated Commissioning Date:

By 2031 or before

Current Situation:

Investigation study is in progress

Consultant:

WSP (Asia) Limited

Other Related Information: