Central Kowloon Route

Project Description:

To relieve traffic congestion on the existing east-west roads across Central Kowloon.

A 4.7 km long dual 3-lane trunk road connecting the West Kowloon reclamation and the proposed Kai Tak Development, including a tunnel of about 3.9km long.

More information can be found in the project website.

Estimated Project Cost:

HK$ 42.36 Billion

Construction Commencement Date:

Dec 2017

Anticipated Commissioning Date:

2025

Contract(s):

Contract No. HY/2014/09

Scope construction of a vertical access shaft at Ho Man Tin and ground investigation and horizontal directional coring.
Commencement Date Dec 2017
Completion Date Jun 2019
Contract Sum HK$268 .5 Million
Contractor Nishimatsu Construction Company, Limited
Resident Engineer Arup – Mott MacDonald Joint Venture

Contract No. HY/2014/07

Scope Construction of tunnels under the seabed of Kowloon Bay and at Ma Tau Kok, and depressed roads and underpass at Kai Tak Development
Commencement Date Jan 2018
Completion Date Jan 2025
Contract Sum HK$ $6.24 Billion
Contractor Gammon Construction Limited
Resident Engineer Arup – Mott MacDonald Joint Venture

Contract No. HY/2014/08

Scope Construction of tunnel at Yau Ma Tei, reconstruction of a section of the Gascoigne Road Flyover and reprovisioning of affected public facilities at Yau Ma Tei
Commencement Date Jan 2018
Completion Date Nov 2024
Contract Sum HK$5.02Billion
Contractor Build King-SKEC Joint Venture
Resident Engineer Arup – Mott MacDonald Joint Venture

Consultant:

Arup – Mott MacDonald Joint Venture (Design and Construction)

Other Related Information: