Footbridge near MTR Kowloon Bay Station Exit B

Project Description:

To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit B and the future East Kowloon Cultural Centre (EKCC) in order to alleviate the congestion at the existing walkway system and enhance connectivity between the MTR Station, the future EKCC and the nearby residential areas.

Estimated Project Cost:

HK$173.5 Million

Construction Commencement Date:

11/2019

Anticipated Commissioning Date:

10/2022

Contract(s):

Contract No. HY/2019/05

Scope To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit B and the future East Kowloon Cultural Centre with associated ramp and staircase.
Commencement Date November 2019
Anticipated Completion
Date
October 2022
Contract Sum HK$126.0 Million
Contractor Kuly Construction & Engineering Company Limited
Resident Engineer WSP (Asia) Limited

Consultant:

WSP (Asia) Limited

Other Related Information: