Tuen Mun – Chek Lap Kok Link (TM-CLKL)

Project Description:

The TM-CLKL will provide the most direct route between the Northwest New Territories and Hong Kong – Zhuhai – Macao Bridge (HZMB), the Airport and North Lantau and also an alternative route to the Airport.

The Northern Connection of TM-CLKL will connect Tuen Mun Area 40 with the HZMB Hong Kong Boundary Crossing Facilities (HKBCF) via a sub-sea tunnel while the Southern Connection will connect the HKBCF and North Lantau on viaducts.

More information can be found in the project website.

Project progress photos can be found in the HZMB project website. Please click

Estimated Project Cost:

  • Detailed design, site investigation and advance works - HK$1.91 Billion
  • Construction works - HK$44.8 Billion

Construction Commencement Date:

  • Advance works - Nov 2011
  • Ground investigation works - May 2012
  • Construction works - Jun 2013

Anticipated Commissioning Date:

Southern Connection

  • Mainline (i.e. the section connecting North Lantau Highway (urban bound)) - 2018
  • Remaining section - 1st half of 2019 at the earliest

Northern Connection

  • 2020 at the earliest

Contract(s) :

Contract No. HY/2010/02

Scope Construction of an artificial island of about 150 hectares (ha), of which about 130 ha is for the HKBCF and about 20 ha is for the southern landfall of the TM-CLKL.
Commencement Date Nov 2011
Anticipated Completion Date TM-CLKL southern landfall reclamation - Mid 2017
Contract Sum HK$6.99 Billion
Contractor China Harbour Engineering Company Limited
Resident Engineer Ove Arup & Partners Hong Kong Limited

Contract No. HY/2012/04

Scope Ground investigation works for the TM-CLKL
Commencement Date May 2012
Completion Date Nov 2013
Contract Sum HK$137 Million
Contractor Gammon Construction Limited
Resident Engineer AECOM Asia Company Limited

Contract No. HY/2012/07

Scope Construction of a dual 2-lane elevated carriageway between the HZMB HKBCF and North Lantau Highway (NLH) with associated slip roads, as well as modifications and realignment of sections of the NLH and Cheung Tung Road at North Lantau, and associated works.
Commencement Date Jun 2013
Anticipated Completion Date 1st half of 2019 at the earliest
Contract Sum HK$8.66 Billion
Contractor Gammon Construction Limited
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2012/08

Scope Construction of a dual 2-lane sub-sea tunnel of about 5 km long between Tuen Mun Area 40 and the HZMB HKBCF and reclamation of about 16.5 ha at Tuen Mun Area 40.
Commencement Date Aug 2013
Anticipated Completion Date 2020 at the earliest
Contract Sum HK$18.2 Billion
Contractor Dragages-Bouygues Joint Venture
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2013/12

Scope Construction of a toll plaza of approximately 5.4 hectares and associated structures, carriageways and footbridge, as well as modification and realignment of sections of Lung Mun Road and Lung Fu Road at Tuen Mun, and associated works.
Commencement Date July 2014
Anticipated Completion Date 1st half of 2019
Contract Sum HK$3.05 Billion
Contractor CRBC – KADEN Joint Venture
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2017/10

Scope Construction of administration building, toll control building and ancillary buildings and facilities and E&M works for the TM-CLKL Northern Connection.
Commencement Date May 2018
Anticipated Completion Date 2020 at the earliest
Contract Sum HK$2.59 Billion
Contractor Gammon Construction Limited
Resident Engineer AECOM Asia Company Limited

Contract No. HY/2014/10

Scope Design, supply and installation of a traffic control and surveillance system for the TM-CLKL Northern Connection.
Commencement Date May 2018
Anticipated Completion Date 2020 at the earliest
Contract Sum HK$158 Million
Contractor GTECH Services (Hong Kong) Limited
Resident Engineer AECOM Asia Company Limited

Consultant:

AECOM Asia Company Limited — investigation and preliminary design of TM-CLKL
AECOM Asia Company Limited — design and construction of TM-CLKL

Other Related Information :