- Widening of the TMRTCS between Yan Oi Town Square and Wong Chu Road of approximately 1.5 km long from a dual 2-lane carriageway to a dual 3-lane carriageway;
- Resurfacing of existing section of TMR;
- Construction of a single-lane flyover of approximately 450 m long, which extends from Tuen Hing Road and runs along Tsing Hoi Circuit to merge eventually with the TMR Kowloon-bound carriageway;
- Reconstruction of four existing footbridges;
- Construction of noise barriers and enclosures;
- Improvement of three existing traffic signal controlled junctions along Castle Peak Road between Tuen Hing Road and Hoi Wing Road; and
- Associated civil, structural, landscaping, geotechnical works, and works on reprovisioning of existing facilities, environmental mitigation, drainage, road lighting, water mains and traffic aids.
|