Project Title :
Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road
(formerly known as Hong Kong – Zhuhai – Macao Bridge North Lantau Highway Connection)

Consultant :
Ove Arup & Partners Hong Kong Limited (Investigation and Preliminary Design (I&PD))

Construction Commencement Date :
Under Review

Construction Completion Date :
Under Review

Estimated Project Cost :
Under Review

Project Objective:

Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road (HKLR) is a dual 3-lane expressway, connecting the main body of the proposed Hong Kong - Zhuhai - Macao Bridge (HZMB) with the Hong Kong Boundary Crossing Facilities (HKBCF).

Description:

The project is to provide a dual 3-lane expressway connecting the proposed HZMB with the HKBCF.

The project includes:-

  1. an expressway connecting the proposed HZMB at the HKSAR boundary with the HKBCF; and
  2. associated civil, structural, geotechnical, marine, environmental protection, landscaping and drainage works, street lighting, traffic aids (including sign gantries), water mains and fire hydrants, traffic control and surveillance system and E&M works.

Current Situation:

We are now evaluating the possible alignment options of the HKLR and assessing the impacts of the project in various aspects, including traffic and environment.  The finalization of the preferred alignment of the HKLR will be subject to the final location and layout of the HKBCF, which is being studied under a separate consultancy.  Upon confirmation of the preferred alignment of the HKLR, we will go through the statutory procedures and commence the construction of the HKLR to tie in with the programmes of the HZMB and HKBCF.  Meanwhile, preparatory work of the HKLR is being carried out to synchronize with those of HZMB and HKBCF.

 