COVER

TABLE OF CONTENTS

 

 

Page

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Purpose of the Report

Structure of the Report

2.**** AIR QUALITY MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

Action and Limit Levels

3.**** NOISE

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

Action and Limit Levels

4.**** CONCLUSIONS AND RECOMMENDATIONS

 

 


List of Tables

 

Table 2.1*****TSP Monitoring Equipment

Table 2.2*****Air Quality Monitoring Parameters and Frequency

Table 2.3*****Location of Air Quality Monitoring Stations

Table 2.4*****Air Quality Monitoring Period

Table 2.5*****Summary of Baseline Air Quality Monitoring Results

Table 2.6*****Derivation of Action and Limit Levels for TSP

Table 2.7*****Derived Action and Limit Levels for 24-hour and 1-hour TSP

Table 3.1*****Noise Monitoring Equipment

Table 3.2*****Noise Monitoring Parameters, Period and Frequency

Table 3.3*****Noise Monitoring Locations

Table 3.4*****Noise Monitoring Period

Table 3.5*****Summary of Baseline Noise Monitoring Results

Table 3.6*****Derivation of Action and Limit Levels for Construction Noise

Table 3.7*****Action and Limit Levels for Construction Noise

 

 


List of Figures

 

Figure 1.1**** Layout of Work Site

Figure 2.1**** Locations of Air Quality Monitoring Stations

Figure 2.2**** Location of Meteorological Station

 

List of Appendices

 

Appendix A*****Baseline Monitoring Scheduled

Appendix B **** Baseline Air Quality Monitoring Results

Appendix C*****Meteorological Data During Baseline Monitoring

Appendix D*****Baseline Noise Monitoring Results

Appendix E*****Calibration Records