Central - Wan Chai Bypass and Island Eastern Corridor Link

(updated as at 31.12.2011)

Project Title :

Central - Wan Chai Bypass and Island Eastern Corridor Link

Consultant :

AECOM Asia Co. Ltd.

Construction Commencement Date :

December 2009

Commissioning Date :

2017

Approved Project Cost ($Million):

28,105 (MOD price)

Project Objective :

The proposed Central - Wan Chai Bypass and Island Eastern Corridor Link forms part of an east-west strategic route along the north shore of Hong Kong Island, which is required to alleviate the traffic congestion along the existing Gloucester Road - Harcourt Road - Connaught Road Central corridor.

Description :

The proposed Central - Wan Chai Bypass and Island Eastern Corridor Link is a 4.5 km long dual three-lane trunk road with a 3.7 km long tunnel. It will link up the Rumsey Street Flyover at Central with the Island Eastern Corridor at North Point near City Garden.

The major elements of the project include:

  1. road tunnels and elevated roads;
  2. associated slip roads and approach roads to the tunnels;
  3. electrical and mechanical systems, including traffic control and surveillance systems;
  4. ancillary buildings for tunnel administration and ventilation; and
  5. ancillary works including noise barriers, drainage and landscaping works.

Related Sites :

  1. For further details of the project, please refer to
  2. Notice under Roads (Works, Use and Compensation) Ordinance published in Government Gazette
  3. EIA Report
  4. Public Forum (19 July 2008) - Construction of Central - Wan Chai Bypass and Island Eastern Corridor Link (Trunk Road) in Causeway Bay Typhoon Shelter and ex-Wan Chai Public Cargo Working Area
  5. Public Forum (25 October 2008) – Central – Wan Chai Bypass and Island Eastern Corridor Link
  6. Information Paper on Reprovisioning Arrangements of Affected Moorings and Anchorage during Trunk Road Construction at the Causeway Bay Typhoon Shelter
  7. Report on Construction of the Trunk Road Tunnel in Causeway Bay Typhoon Shelter and ex-Wan Chai Public Cargo Working Area
  8. Consultation with Hong Kong Construction Association
Current Contract No. Contract Title
HY/2009/16 Central - Wan Chai Bypass - Provision and Laying of Private Moorings
HY/2009/11 Central - Wan Chai Bypass - North Point Reclamation
HY/2009/17 Central - Wan Chai Bypass - FEHD Whitfield Depot Reprovisioning Works
HY/2009/18 Central - Wan Chai Bypass - Central Interchange
HY/2009/15 Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon Shelter Section)
HY/2009/19 Central - Wan Chai Bypass - Tunnel (North Point Section) and Island Eastern Corridor Link