The project includes :-
-
a 4.7 km dual 3-lane trunk road between the West Kowloon reclamation and the future Kai Tak development (formerly known as South East Kowloon development), including a dual 3-lane tunnel of about 3.9km;
-
access roads at the western end of CKR to link with Yau Ma Tei Interchange of the West Kowloon Highway;
-
access roads at the eastern end of CKR to link with the road network in East Kowloon;
-
reprovisioning of Government and Institutional facilities affected by the CKR project on a like-for-like basis;
-
administration and ventilation buildings; and
-
associated environmental, geotechnical, landscape, drainage and electrical and mechanical works.
|