Picture
Major Projects

Retrofitting of Noise Barriers on Tsing Tsuen Bridge at Tsing Yi and Tsuen Wan Approaches

(updated as at 30.11.2011)

Contract Title :

HY/2007/08 - Retrofitting of Noise Barriers on Tsing Tsuen Bridge at Tsing Yi and Tsuen Wan Approaches

Contractor :

Leader Civil Engineering Corporation Ltd.

Design and Construction Consultant :

Ove Arup & Partners Hong Kong Limited

Construction Commencement Date :

8 January 2008

Commissioning Date :

October 2010

Contract Sum ($Million) :

151.49

Description :

The Contract includes:

  1. retrofitting of vertical noise barriers of about 160 metres (m) in length and five metres in height, and single-leaf cantilevered noise barriers of about 160m in length and six metres in height along the footpath of the eastbound section of Tsing Tsuen Bridge near Cheung On Estate at Tsing Yi;
  2. retrofitting of single-leaf cantilevered noise barriers of about 320 m in length and six metres in height along the central divider and the slow lane of the eastbound section of Tsing Tsuen Bridge near Cheung On Estate at Tsing Yi;
  3. retrofitting of single-leaf cantilevered noise barriers of a total length of about 590 m and seven metres in height, and 270 m and six metres in height along the central divider and the footpath of the eastbound section of Tsing Tsuen Bridge near Riviera Gardens at Tsuen Wan;
  4. associated road, drainage, geotechnical, street lighting and landscaping works; and
  5. implementation of an environmental monitoring and audit (EM&A) programme for works mentioned in items (1) to (4) above.

Related Sites :

  1. Notice under Roads (Works, Use and Compensation) published in Government Gazette
  2. Legislative Council Public Works Sub-committee Paper