The Contract ”Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section” comprises 4.7km dual 3-lane carriageway from Siu Lam to Sam Shing Hui.
The scope of the contract mainly includes:
- reconstruction and re-alignment of Tuen Mun Road between Siu Lam and Sam Shing Hui to current expressway standard;
- widening of traffic lanes to expressway standard width and provision of hard shoulders and verges along Tuen Mun Road;
- widening of highways structures including vehicular bridges, box culverts and subways;
- replacement of the existing road restraint system with new types of parapets and roadside barriers;
- reconstruction of road pavements;
- installation of noise enclosure; and
- ancillary works including slope, drainage, landscaping, utility works; installation of traffic control and surveillance and fire fighting systems; modification of directional signs to current expressway standard; and provision of catchwater decking and natural terrain hazard mitigation measures.
For more information, please visit Contract Web Site. |