Extension of Footbridge Network in Tsuen Wan – Footbridge A along Tai Ho Road
(updated as at 30.11.2011)
Contract Title :
HY/2007/03 – Extension of Footbridge Network in Tsuen Wan – Footbridge A along Tai Ho Road
Consultant :
Scott Wilson Limited
Contractor :
Sun Fook Kong (Civil) Limited
Construction Commencement Date :
17 December 2008
Commissioning Date :
Early 2012
Contract Sum ($Million) :
118.3
Description :
The scope of works comprises:
- construction of an approximately 620-metre long covered footbridge along Tai Ho Road and Castle Peak Road - Tsuen Wan with three lifts and two covered staircases. The footbridge will be connected to the existing elevated pedestrian walkway adjacent to MTR Tsuen Wan Station, Nan Fung Centre, the existing footbridge near Sai Lau Kok Garden and the existing footbridge across Sha Tsui Road;
- modification of the existing covered footbridges; and
- ancillary works including construction of footpaths, demolition and realignment of the existing boundary walls, drainage and landscaping works.