Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
(updated as at 31.12.2011)
Contract Title :
HY/2003/19 – Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
Contractor :
CCECC & CRWJ Joint Venture
( being a joint venture of China Civil Engineering Construction Corporation & China Railway Wuju Group Corporation )
Construction Commencement Date :
June 2004
Commissioning Date :
February 2009
Contract Sum ($Million) :
745
Description :
The project includes :
-
widening and realignment of a 3.6 km section of Tung Chung Road (TCR) between Lung Tseng Tau and Pak Kung Au from a single-lane road for two-way traffic to a single two-lane road for two-way traffic with a footpath having a minimum width of 1.6 m, and construction of a 2.6 km long single two-lane road between Pak Kung Au and Cheung Sha, including elevated highway structures of a total length of 750 m, with a footpath of a minimum width of 1.6 m;
-
provision of 21 passing bays/bus-bays along the road and a roundabout at Cheung Sha; and
-
associated works including road rehabilitation, drainage, utility, environmental mitigation measures, landscaping, slope stabilisation, traffic aids, road safety enhancement measures and traffic control and surveillance system, lighting, and electrical and mechanical (E&M) works.
Related Sites :
- Notice under Roads (Works, Use and Compensation) published in Government Gazette
- Legislative Council Panel on Transport
- Legislative Council Public Works Subcommittee Paper
- Environmental Permit
- EIA Report