The
project includes :
-
widening and realignment of a 3.6 km section
of Tung Chung Road (TCR) between Lung Tseng Tau and
Pak Kung Au from a single-lane road for two-way traffic
to a single two-lane road for two-way traffic with
a footpath having a minimum width of 1.6 m, and construction
of a 2.6 km long single two-lane road between Pak
Kung Au and Cheung Sha, including elevated highway
structures of a total length of 750 m, with a footpath
of a minimum width of 1.6 m;
-
provision of 21 passing bays/bus-bays along the road
and a roundabout at Cheung Sha; and
-
associated works including road rehabilitation, drainage, utility, environmental mitigation measures, landscaping, slope stabilisation, traffic aids, road safety enhancement measures and traffic control and surveillance system, lighting, and electrical and mechanical (E&M) works.
|