Ting
Kau Bridge and Approach Viaduct
Contract
title:
Ting Kau Bridge
and Approach Viaduct
Contractor :
Ting Kau Contractors Joint Venture
Completion Date :
May 1998
Description
The
project is for
(a) roadworks for the remaining phase of the northwest Tsing Yi interchange
with the Lantau Link;
(b) a long span cable-supported Ting Kau Bridge carrying a dual three-lane
carriageway over Rambler Channel;
(c) an approach viaduct of approximately 700 metres in length linking
the Ting Kau Bridge with Tuen Mun road and the Tai Lam Tunnel of the
Country Park section;
(d) reclamation to provide for ship impact protection at bridge supporting
piers and works areas;
(e) associated site formation, slope drainage and stability works including
landscaping and rehabilitation;
(f) associated electrical and mechanical systems, traffic control and
surveillance systems and road lighting facilities; and
Ting
Kau Bridge at night
|
Construction
of the
Ting Kau Bridge
approach over
Castle Peak Road |
Construction
of
bridge towers |
|