Route 8 - East Tsing Yi Viaduct
(updated as at 30.11.2010)
Contract title :
HY/2004/02: East TsingYi Viaduct
Main Contractor :
Dragages – China Harbour Joint Venture
Construction Commencement Date :
December 2004
Commissioning Date :
December 2009 (Commissioned)
Contract Value ($Million):
1012
Contract Description :
East Tsing Yi Viaduct is part of the Route 8 (formerly Route 9) between Tsing Yi and Cheung Sha Wan project. It links up Nam Wan Tunnel and Stonecutters Bridge, both are under construction. The Contract works comprises the following major elements:
- the construction of a dual 3 –lane viaduct of about 1.1 km long with hard shoulder in Tsing Yi Island linking Stonecutters Bridge and Nam Wan Tunnel;
- the construction of viaduct ramps linking the mainline and the road networks within the vicinity of Container Terminal No. 9.; and
- the associated roads, drainage, environmental mitigation measures slope works etc.
Back to Home Page of Route 8 between Tsing Yi and Cheung Sha Wan