Route 8 - Nam Wan Tunnel and West Tsing Yi Viaduct
(updated as at 30.11.2010)
Contract title :
HY/2001/16 - Route 8 - Nam Wan Tunnel and West Tsing Yi Viaduct
Main Contractor :
Gammon Skanska International Joint Venture
Construction Commencement Date :
April 2003
Commissioning Date :
December 2009 (Commissioned)
Contract Value ($Million):
1479.3
Contract Description :
Nam Wan Tunnel and West Tsing Yi Viaduct (NWT & WTYV) is one of the major elements of Route 8 between Tsing Yi and Cheung Sha Wan linking the existing Cheung Tsing Highway and the proposed Route 8 East Tsing Yi Viaduct.
The scope of NWT & WTYV Contract mainly includes:
- construction of a 1.2 km dual 3-lane Nam Wan Tunnel including tunnel E&M installations;
- construction of a 1.5 km West Tsing Yi Viaduct with hard shoulders connecting Nam Wan Tunnel and existing Cheung Tsing Highway;
- construction of a portal building on the east side of Nam Wan Tunnel, a west portal structure on the west side thereof and a West Control Building; and
- road junction improvement works at Sai Tso Wan Road in southwest Tsing Yi