Deep Bay Link

(updated as at 02.05.2008)

Contract title : 

HY/2002/23 - Deep Bay Link - Southern Section

HY/2002/24 - Deep Bay Link - Northern Section

Main Contractor :

HY/2002/23 : China State JV

HY/2002/24 : Gammon Construction Ltd

Construction Commencement Date :

HY/2002/23 : June 2003

HY/2002/24 : June 2003

Commissioning Date :

HY/2002/23 : July 2007

HY/2002/24 : July 2007
(ongoing outstanding works include soft landscaping works and works on local roads)

Contract Value ($Million) :

HY/2002/23 : 1213

HY/2002/24 : 1716.1

Description :

The project includes:

  1. construction of a 5.4-kilometre dual three-lane carriageway linking the Hong Kong-Shenzhen Western Corridor at its landing point in Ngau Hom Shek with the Yuen Long Highway at Lam Tei;
  2. construction of two interchanges respectively at Lam Tei and Ha Tsuen and an access road to connect DBL with Ha Tsuen areas;
  3. construction of turnaround facilities with weighing station, vehicle recovery base and helipad at Ha Tsuen Interchange;
  4. construction of a traffic control surveillance system; and
  5. associated civil, structural, electrical and mechanical, geotechnical, landscape and drainage works, fire services, water works, environmental mitigation measures, street lighting, traffic aids and directional signs.