1.
Widening of a section of Sai Sha Road about 650
m to dual two-lane between Kam Ying Road and the
Junction with Trunk Road T7 at Sha On Street. |
| |
2.
Construction of a roundabout at the junction of
Sai Sha Road with Sha On Street. |
| |
3.
Construction of a four-lane carriageway with associated
footpaths for future connection to the access road
to Whitehead. |
| |
4.
Construction of two footbridges across Sai Sha
Road with the provision of lifts. |
| |
5.
Construction of two pedestrian/cyclist subways. |
| |
6.
Modification of the existing junction of Sai Sha
Road and Kam Ying Road including provision of a
ramp and a staircase adjacent to the eastbound
of Sai Sha Road for the completion of the existing
subway across Sai Sha Road. |
| |
7.
Reconstruction of the existing footpaths, cycle
tracks and village access roads. |
| |
8.
Erection of noise barriers along Sai Sha Road. |
| |
9.
Ancillary works including drainage, slope, landscaping
and electrical and mechanical works, construction
of embankments, retaining walls and cycle parks. |
| |
|