Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct

Contract title:
Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct
Main Contractor :
China Harbour Engineering Company Limited
Construction Commencement Date :
April 2002
Commissioning Date :
March 2008
(Partial opening of a section of mainline and 3 slip roads connecting the local road network at Container Terminal No. 8 with Route 8 (between Cheung Sha Wan and Shatin section) and West Kowloon Highway Southbound. The commissioning date of the remaining part to be determined in the context of the whole project)
Contract Value ($Million):
1538
 
 
Click herepdf format File size: ( 332 Kb )
 

Contract Description :
Ngong Shuen Chau Viaduct (NSCV) is an integral part of Route 8 between Tsing Yi and Cheung Sha Wan. NSCV comprises a 2.2 km dual 3-lane carriageway connecting the proposed Stonecutters Bridge with West Kowloon Highway and the section of Route 8 between Cheung Sha Wan and Shatin at Lai Wan Interchange in Cheung Sha Wan.
The scope of the NSCV contract mainly includes: -
  a) construction of Ngong Shuen Chau Viaduct and its slip roads connecting with the local road network at Container Terminal No. 8;
  b) realignment of sections of Container Port Road South, Hing Wah Street West, Lai Po Road and Lin Cheung Road Northbound; and
  c) Ancillary works including construction of noise barriers, drainage and landscape works.
 
For more information, please visit Contract Web Site.
 