(a)
Portion entrusted to KCRC includes |
| |
(i)
construction of a 370m long, dual 2-lane underpass
along Salisbury Road at Its Junction with Chatham
Road South; |
| |
(ii)
relocation of an existing 4.5m wide pedestrian
subway across Salisbury Road; |
| |
(iii)
widening of Salisbury Road from Wing On Plaza to
Nathan Road; and |
| |
(iv)
associated road reconstruction, traffic signalization,
drainage, water and landscaping works. |
| (b)
Portion being carried out by the Government includes |
| |
(i)
widening of Salisbury Road from Nathan Road to
Canton Road; and |
| |
(ii)
associated road reconstruction, traffic signalization,
drainage, water and landscaping works, |
| |
|
| Environmental
Monitoring and Audit: |
| |
(a)
Portion entrusted to KCRC |
| |
http://www.env-ere.kcrc.com/MainHtml/index.htm |
| |
|
| |
(b)
Portion being carried out by the Government |
| |
Baseline
Monitoring Report |
| (April
2002) |
|
|
|
| |
Monthly
EM&A Report |
| Report
No. 6 (November 2002) |
|
|
| Final
Report (October
2002) |
|
|
| Report
No. 5 (October 2002) |
|
|
| Report
No. 4 (October 2002) |
|
|
| Quarterly
Report No.1 (June 2002) |
|
|
| Report
No. 3 (June 2002) |
|
|
| Report
No. 2 (May 2002) |
|
|
| Report
No. 1 (May 2002) |
|
|
|