CONTRACT NO. HY/98/22

SUPPLEMENTARY AGREEMENT NO. 3

ROAD WIDENING WORKS OF SALISBURY ROAD

BETWEEN NATHAN ROAD AND CANTON ROAD

 

MONTHLY EM&A REPORT NO. 2

 

CONTENTS

 

EXECUTIVE SUMMARY

 

1.0     ENVIRONMENTAL STATUS

1.1     Construction Programme

1.2     Works undertaken in April 2002

1.3     Project Works Area

 

2.0     IMPLEMENTATION STATUS ¡V ADVICE ON THE IMPLEMENTATION OF ENVIRONMENTAL PROTECTION AND POLLUTION CONTROL/MITIGATION MEASURES

 

3.0     MONITORING RESULTS

3.1             Air Quality

3.2             Noise

 

4.0     REPORT ON NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

 

5.0     FUTURE KEY ISSUES

 

          6.0     ADVICE ON THE SOLID AND LIQUID WASTE MANAGEMENT STATUS

 

 

         APPENDICES

 

Appendix A   Construction Programme

 

Appendix B   Project Works Area

 

Appendix C   Schedule of Environmental Protection and Pollution Control/Mitigation Measures

 

Appendix D   Record Photos

 

 

 

 

 


EXECUTIVE SUMMARY

 

This is the second EM&A Report for the project of Road Widening Works of Salisbury Road between Nathan Road and Canton Road. The contract entitled ¡¥Contract No. HY/98/22, Supplementary Agreement No. 3, Road Widening Works of Salisbury Road between Nathan Road and Canton Road¡¦ was awarded to Downer Construction (Hong Kong) Limited in February 2002.

 

This report mainly presents the EM&A works undertaken for the captioned project from 1 April 2002 to 30 April 2002.

 

Air Quality

 

Site inspection was carried out once per week by checking the adequacy of the mitigation measures implemented by the Contractor with reference to the EM&A Manual.

 

No obvious air quality deterioration was recorded during the reporting period.

 

Noise Level

 

No indication of noise exceedance was observed during weekly site inspections for this reporting period.

 

Others

 

No non-compliance, no complaints, no notifications of summons and successful prosecutions were received.

 

Future Key Issues

 

Future construction activities, such as excavation, footpath construction, resurfacing and reconstruction works, drainage works and landscaping works should be closely monitored to ensure the effects on air quality and noise level are minimised.

 


1.0     ENVIRONMENTAL STATUS

 

1.1     Construction Programme

 

The latest construction programme is attached in Appendix A. Environmental protection/mitigation measures are implemented during the construction phase, the construction programme is subject to continuous refinement. As an example, 45 days have been allowed to transplant the existing trees (ID no. 10) and 30 days have been allocated to plant the trees to relocated areas (ID no. 11).

 

1.2     Works undertaken in April 2002

 

The major construction activities and works undertaken in April 2002 were as follows:

 

¡P                     ATC and street lighting drawpit/ducting

 

¡P                     Drainage works (installation of concrete drainage pipes and construction of manholes)

 

¡P                     Resurfacing and reconstruction along southbound lane of Salisbury Road

 

¡P                     Street lighting diversion at footpath area

 

¡P                     Reinstatement of pavement area

 

¡P                     Road signage at footpath area

 

Contact Details

 

Titles, names and contact telephone numbers of the key personnel of the captioned project are tabulated below:

 

Title

Name

Contact Numbers

Project Director

Mr. Peter Bugden

2831 8335

Quality and Environmental Department

Mr. Richard Cuta

2831 8123

ET ¡V Babtie Asia Limited (Environmental Consultant)

Mr. Mark K T Cheung

2738 3803

Project Manager

Mr. Ricky Lee

9252 6252

Site Agent

Mr. M.W. Suen

9202 9341

General Foreman

Mr. K.K. Lau

6274 3128

Foreman

Mr. To Wing Tak

6274 5515

Survey Team

Mr. T.S. Chan

6274 3633

Safety Team

Mr. Yuen Wai Ip

9038 9055

 

1.3     Project Works Area

 

The project works area is shown in Appendix B.

 


2.0             IMPLEMENTATION STATUS ¡V ADVICE ON THE IMPLEMENTATION OF ENVIRONMENTAL PROTECTION AND POLLUTION CONTROL/MITIGATION MEASURES

 

Schedule of environmental protection and pollution control/mitigation measures implemented in the captioned project is attached in Appendix C.

 

 

3.0     MONITORING RESULTS

 

3.1     Air Quality

 

As the environmental mitigation measures implemented by the Contractor during the construction phase are adequate, no Total Suspended Particulate (TSP) concentration level has to be recorded. Please refer to photos in Appendix D for implementation of dust reduction measures done by the Contractor.

 

Photos in Appendix D show the environmental mitigation measures implemented by the Contractor to control dust emissions during this reporting period.

 

Photo 1 shows screening of the construction site with hoardings to reduce dust emissions during the construction phase. Moreover, as recommended in Table C3 of Appendix C, some of these hoardings have their surfaces treated to enhance their visual interest and harmony with surrounding townscape.

 

In addition to screening the construction site with hoardings and covering the excavated materials with tarpaulin, regular watering has been carried out to reduce dust emissions from exposed site surfaces and excavated materials, as recommended in the EM&A Manual (Photo 2).

 

3.2     Noise

 

No obvious noise level exceedance was observed during site inspections.

 


4.0             REPORT ON NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

 

4.1     Non-compliance

 

4.1.1  Air quality

 

No non-compliance was identified during site inspections as the mitigation measures implemented by the Contractor during site inspections are adequate.

 

4.1.2  Noise

 

No non-compliance in construction noise level was observed during site inspections.

 

4.2     Complaints

 

No complaint was received in the reporting month.

 

4.3     Notifications of Summons and Successful Prosecutions

 

No notifications of summons or successful prosecutions were received by the Contractor in the reporting month.

 

 


5.0     FUTURE KEY ISSUES

 

According to the latest construction programme attached in Appendix A, the proposed construction works to be carried out in the next reporting period (May 2002) are as follows:

 

¡P                     Street lighting diversion at footpath area

 

¡P                     Drainage works (installation of concrete drainage pipes, construction of manholes and box culverts)

 

¡P                     Resurfacing and construction works of westbound Salisbury Road

 

¡P                     Resurfacing and reinstatement of the footpath area outside Hong Kong Cultural Centre

 

¡P                     Reconstruction of central divider

 

¡P                     Installation of road furniture and road signage

 

Some of them may have potential environmental impact and will require mitigation measures, and such activities will be monitored closely during future site inspections.

 

 


6.0     ADVICE ON THE SOLID AND LIQUID WASTE MANAGEMENT STATUS

 

The revised waste management plan has been submitted in this reporting period. The Contractor has carried out the construction works in accordance with the revised waste management plan.

 

 

 

 

 


APPENDIX A     CONSTRUCTION PROGRAMME

 

 





 

 

 

 

 


APPENDIX B     PROJECT WORKS AREA

 

 

 

 

 

 


APPENDIX C     SCHEDULE OF ENVIRONMENTAL PROTECTION AND POLLUTION CONTROL/MITIGATION MEASURES

 

The schedule of implementation of the recommended mitigation measures for various environmental aspects are presented in Tables C1 and C4 for different environmental aspects

 

Table C1           Summary of Proposed Mitigation Measures for Construction Dust Impact

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures/Timing of completion of Measures

 

Implementation Dept/agent

Implementation Stage

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 3.5

Section 2.1

Established standards and guidelines with EPD¡¦s recommended pollution control clauses should be incorporated in the contract documents

 

During Construction Phase within the site area

Contractor

Ö

Ö

 

 

Dust reduction measures while carrying out construction works in accordance with the Air Pollution Control (Construction Dust) Regulation to minimise the dust emission from the construction site

Ö

Ö

 

TM on EIA Process, APCO, Air Pollution Control (Construction Dust) Regulation

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual


Table C2           Summary of Proposed Mitigation Measures for Construction Waste Management

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures/Timing of completion of Measures

 

Implementation Dept/agent

Implementation Stage

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 6.3

Section 3.1

On-site separation of both municipal solid waste and C&D waste should be conducted as far as possible.  Construction waste should be sorted on-site into construction & demolition waste and public fill fraction for re-use and recycling as far as practical

 

During Construction Phase within the site area

Contractor

Ö

 

Ö

 

Ö

TM on EIA Process, WDO

Waste management measures would be proposed in accordance with the Criteria for Evaluating Waste Management Implications stipulated in Annex 7 of the TM EIAO and follow the Guidelines for Assessment of Waste Management Implications stated in Annex 15 of the TM EIAO as appropriate

 

Standard C&D materials management clause should be included in the construction contact

 

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual


Table C3           Summary of Proposed Mitigation Measures for Visual Impact

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures

 

Funding Dept/agent

Implementation Dept/agent

Maintenance Agent

Implementation Stages

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 8.7 (Temporary Mitigation Measures

N/A

Screening of site works by hoardings

In place at the commencement and for the duration of the Construction Phase with the site area

HyD

Contractor

Contractor (During Construction Phase)

Ö

 

Ö

 

 

 

Surface treatment of site hoardings to enhance their visual interest and harmony with surrounding landscape/townscape

 

 

 

 

Locating temporary buildings (e.g. Site office) in least visually prominent locations

 

Design Engineer/Contractor

 

Ö

 

 

Retention of vegetation within the works site area where possible

 

Landscape Architect / Contractor

Ö

 

Ö

 

 

Provision of fences around all the low, circular raised planters to ensure that materials and debris will not be dumped on tree roots

 

Contractor

 

Ö

 

 

Footpaths along south side of Salisbury Road will be replanted with heavy standard trees where possible.  The proposed planning will also reprovide shading along the footpath temporarily removed during the construction stage

In place by the completion of Construction Phase within the site area, to be maintained for the duration of Operation Phase

HyD

Landscape Architect/Contractor

Contractor (During construction phase)

 

LCSD (during operation phase)

Ö

 

 

Ö

 

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual


Table C4           Summary of Proposed Mitigation Measures for Landscape and Townscape Impacts

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures

 

Funding Dept/agent

Implementation Dept/agent

Maintenance Agent

Implementation Stages

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 8.8 (Temporary Mitigation Measures

N/A

Re-routing of pedestrian routes away from the work site where possible

 

In place at the commencement and for the duration of the Construction Phase with the site area

HyD

Contractor

Contractor (During Construction Phase)

 

 

Ö

 

 

 

Re-routing of pedestrian routes through well defined public access

 

Retaining and minimizing damage to vegetation where possible.  Care shall be taken not to damage those trees identified in the Tree Survey Report to be retained during the construction phase

 

Careful and efficient transplanting of existing vegetation carried out under the supervision of a professional landscape architect

 

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual

 


Table C4           Summary of Proposed Mitigation Measures for Landscape and Townscape Impacts (continued)

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures

 

Funding Dept/agent

Implementation Dept/agent

Maintenance Agent

Implementation Stages

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 8.8 (Temporary Mitigation Measures)

N/A

Mitigation for vegetation loss may be achieved in the form of compensatory planting of transplanting of existing trees in the area or new plant material as suggested in the Tree Survey Report.  This is recommended to be implemented on the footpaths of Salisbury Road where space allows

 

In place at the commencement of the Construction Phase within the site area, to be maintained for the duration of Operation Phase

HyD

Contractor (The detailed landscape proposal shall be provided to LCSD for endorsement)

Contractor (During Construction Phase)

 

HyD (first 12 months of operational phase)

 

LCSD (after first 12 months in operational phase)

Ö

 

 

 

Ö

Works Bureau Technical Circular No. 24/94

Relocation of existing trees within the site and where possible, ensuring transplanted trees are to be planted to new position within the site

 

Landscape Architect / Contractor

Ö

 

Ö

Planting of heavy standard trees along footpaths of Salisbury Road to create vegetation screen

 

Detailing of street furniture such as footpath surfaces and railings to enhance the pedestrian environment

 

Contractor

HyD

Ö

Ö

 

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual


Table C4           Summary of Proposed Mitigation Measures for Landscape and Townscape Impacts (continued)

 

EIA Ref.

EM&A Log Ref

Environmental Protection Measures

Location/Duration of measures

 

Funding Dept/agent

Implementation Dept/agent

Maintenance Agent

Implementation Stages

 

Relevant Legislation and Guidelines

Des

Con

Op

Section 8.8 (Temporary Mitigation Measures)

N/A

Planting of flowering trees and shrubs etc, shall be considered so as to create colour impacts, strong sense of seasonal changes and where possible, provide shade for the pedestrians

 

In place at the commencement of the Construction Phase within the site area, to be maintained for the duration of Operation Phase

HyD

Landscape Architect/Contractor

Contractor (During Construction Phase)

 

HyD (first 12 months of operational phase)

 

LCSD (after first 12 months in operational phase)

 

Ö

 

 

 

Ö

Works Bureau Technical Circular No. 24/94

 

Notes:

 

1.                  Des = Design, C = Construction, O = Operation

2.                  EIA Ref = Section number reference in EIA for Salisbury Road Underpass and Associated Road Improvement Works including Middle Road Circulation System (Final EIA Report (June 1999))

3.                  EM&A Log ref = Section number reference in EM&A Manual

 

 

 

 

 

 

 


APPENDIX D     RECORD PHOTOS

 

 

 

 

 

Photo 1

 

 

 

 

Photo 2

 

 

 

Record Photos for EM&A Works

 

Contract No. HY/98/22

Supplementary Agreement No. 3

Road Widening Works of Salisbury Road

between Nathan Road and Canton Road