CONTRACT NO. HY/98/22
SUPPLEMENTARY AGREEMENT NO. 3
ROAD WIDENING WORKS OF SALISBURY
ROAD
BETWEEN NATHAN ROAD AND CANTON ROAD
MONTHLY EM&A REPORT NO. 2
CONTENTS
1.1 Construction
Programme
1.2 Works
undertaken in April 2002
1.3 Project
Works Area
3.1
Air
Quality
3.2
Noise
4.0 REPORT ON NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL
PROSECUTIONS
6.0 ADVICE ON THE SOLID AND LIQUID WASTE MANAGEMENT STATUS
APPENDICES
Appendix A Construction Programme
Appendix B Project Works Area
Appendix C Schedule of Environmental Protection and Pollution
Control/Mitigation Measures
Appendix D Record Photos
This is the second EM&A
Report for the project of Road Widening Works of Salisbury Road between Nathan
Road and Canton Road. The contract entitled ¡¥Contract No. HY/98/22,
Supplementary Agreement No. 3, Road Widening Works of Salisbury Road between
Nathan Road and Canton Road¡¦ was awarded to Downer Construction (Hong Kong)
Limited in February 2002.
This report mainly presents the
EM&A works undertaken for the captioned project from 1 April 2002 to 30
April 2002.
Air Quality
Site inspection was carried out
once per week by checking the adequacy of the mitigation measures implemented
by the Contractor with reference to the EM&A Manual.
No obvious air quality
deterioration was recorded during the reporting period.
Noise Level
No indication of noise exceedance
was observed during weekly site inspections for this reporting period.
Others
No non-compliance, no complaints,
no notifications of summons and successful prosecutions were received.
Future Key Issues
Future construction activities,
such as excavation, footpath construction, resurfacing and reconstruction
works, drainage works and landscaping works should be closely monitored to
ensure the effects on air quality and noise level are minimised.
1.1 Construction Programme
The latest
construction programme is attached in Appendix A. Environmental
protection/mitigation measures are implemented during the construction phase,
the construction programme is subject to continuous refinement. As an example,
45 days have been allowed to transplant the existing trees (ID no. 10) and 30
days have been allocated to plant the trees to relocated areas (ID no. 11).
1.2 Works undertaken in April 2002
The major
construction activities and works undertaken in April 2002 were as follows:
¡P
ATC and street lighting
drawpit/ducting
¡P
Drainage works
(installation of concrete drainage pipes and construction of manholes)
¡P
Resurfacing and
reconstruction along southbound lane of Salisbury Road
¡P
Street lighting diversion
at footpath area
¡P
Reinstatement of pavement
area
¡P
Road signage at footpath
area
Titles,
names and contact telephone numbers of the key personnel of the captioned
project are tabulated below:
|
Title |
Name |
Contact Numbers |
|
Project Director |
Mr.
Peter Bugden |
2831
8335 |
|
Quality and Environmental Department |
Mr.
Richard Cuta |
2831
8123 |
|
ET ¡V Babtie Asia Limited (Environmental
Consultant) |
Mr.
Mark K T Cheung |
2738
3803 |
|
Project Manager |
Mr.
Ricky Lee |
9252
6252 |
|
Site Agent |
Mr.
M.W. Suen |
9202
9341 |
|
General Foreman |
Mr.
K.K. Lau |
6274
3128 |
|
Foreman |
Mr. To
Wing Tak |
6274
5515 |
|
Survey Team |
Mr.
T.S. Chan |
6274
3633 |
|
Safety Team |
Mr. Yuen
Wai Ip |
9038
9055 |
1.3 Project
Works Area
The
project works area is shown in Appendix B.
Schedule
of environmental protection and pollution control/mitigation measures
implemented in the captioned project is attached in Appendix C.
3.1 Air
Quality
As the environmental mitigation measures implemented
by the Contractor during the construction phase are adequate, no Total
Suspended Particulate (TSP) concentration level has to be recorded. Please
refer to photos in Appendix D for implementation of dust reduction measures
done by the Contractor.
Photos in
Appendix D show the environmental mitigation measures implemented by the
Contractor to control dust emissions during this reporting period.
Photo 1 shows
screening of the construction site with hoardings to reduce dust emissions
during the construction phase. Moreover, as recommended in Table C3 of Appendix
C, some of these hoardings have their surfaces treated to enhance their visual
interest and harmony with surrounding townscape.
In addition to screening the construction site with
hoardings and covering the excavated materials with tarpaulin, regular watering
has been carried out to reduce dust emissions from exposed site surfaces and
excavated materials, as recommended in the EM&A Manual (Photo 2).
3.2 Noise
No obvious noise level exceedance was observed during
site inspections.
4.0
REPORT ON NON-COMPLIANCE,
COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
4.1 Non-compliance
4.1.1 Air
quality
No non-compliance was identified during site inspections
as the mitigation measures implemented by the Contractor during site
inspections are adequate.
4.1.2 Noise
No non-compliance in construction noise level was
observed during site inspections.
4.2 Complaints
No
complaint was received in the reporting month.
4.3 Notifications
of Summons and Successful Prosecutions
No notifications
of summons or successful prosecutions were received by the Contractor in the
reporting month.
According to the
latest construction programme attached in Appendix A, the proposed construction
works to be carried out in the next reporting period (May 2002) are as follows:
¡P
Street lighting diversion at footpath area
¡P
Drainage works (installation of concrete drainage pipes, construction of
manholes and box culverts)
¡P
Resurfacing and construction works of westbound Salisbury Road
¡P
Resurfacing and reinstatement of the footpath area outside Hong Kong
Cultural Centre
¡P
Reconstruction of central divider
¡P
Installation of road furniture and road signage
Some of them may
have potential environmental impact and will require mitigation measures, and
such activities will be monitored closely during future site inspections.
6.0 ADVICE
ON THE SOLID AND LIQUID WASTE MANAGEMENT STATUS
The revised waste management plan has been
submitted in this reporting period. The Contractor has carried out the
construction works in accordance with the revised waste management plan.
APPENDIX A CONSTRUCTION PROGRAMME






APPENDIX C SCHEDULE OF
ENVIRONMENTAL PROTECTION AND POLLUTION CONTROL/MITIGATION MEASURES
The
schedule of implementation of the recommended mitigation measures for various
environmental aspects are presented in Tables C1 and C4 for different
environmental aspects
Table C1 Summary
of Proposed Mitigation Measures for Construction Dust Impact
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures/Timing of completion of Measures |
Implementation
Dept/agent |
Implementation
Stage |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||
|
Section
3.5 |
Section
2.1 |
Established standards and guidelines
with EPD¡¦s recommended pollution control clauses should be incorporated in
the contract documents |
During
Construction Phase within the site area |
Contractor |
Ö |
Ö |
|
|
|
Dust
reduction measures while carrying out construction works in accordance with
the Air Pollution Control (Construction Dust) Regulation to minimise the dust
emission from the construction site |
Ö |
Ö |
|
TM
on EIA Process, APCO, Air Pollution Control (Construction Dust) Regulation |
||||
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for
Salisbury Road Underpass and Associated Road Improvement Works including Middle
Road Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
Table C2 Summary
of Proposed Mitigation Measures for Construction Waste Management
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures/Timing of completion of Measures |
Implementation
Dept/agent |
Implementation
Stage |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||
|
Section
6.3 |
Section
3.1 |
On-site
separation of both municipal solid waste and C&D waste should be
conducted as far as possible.
Construction waste should be sorted on-site into construction &
demolition waste and public fill fraction for re-use and recycling as far as
practical |
During
Construction Phase within the site area |
Contractor |
Ö |
Ö |
Ö |
TM
on EIA Process, WDO |
|
Waste
management measures would be proposed in accordance with the Criteria for
Evaluating Waste Management Implications stipulated in Annex 7 of the TM EIAO
and follow the Guidelines for Assessment of Waste Management Implications
stated in Annex 15 of the TM EIAO as appropriate |
||||||||
|
Standard
C&D materials management clause should be included in the construction
contact |
||||||||
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for
Salisbury Road Underpass and Associated Road Improvement Works including Middle
Road Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
Table C3 Summary
of Proposed Mitigation Measures for Visual Impact
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures |
Funding
Dept/agent |
Implementation
Dept/agent |
Maintenance
Agent |
Implementation
Stages |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||||
|
Section
8.7 (Temporary Mitigation Measures |
N/A |
Screening
of site works by hoardings |
In
place at the commencement and for the duration of the Construction Phase with
the site area |
HyD |
Contractor |
Contractor
(During Construction Phase) |
Ö |
Ö |
|
|
|
Surface
treatment of site hoardings to enhance their visual interest and harmony with
surrounding landscape/townscape |
|
|
|
|||||||
|
Locating
temporary buildings (e.g. Site office) in least visually prominent locations |
Design
Engineer/Contractor |
|
Ö |
|
||||||
|
Retention
of vegetation within the works site area where possible |
Landscape
Architect / Contractor |
Ö |
Ö |
|
||||||
|
Provision
of fences around all the low, circular raised planters to ensure that materials
and debris will not be dumped on tree roots |
Contractor |
|
Ö |
|
||||||
|
Footpaths
along south side of Salisbury Road will be replanted with heavy standard
trees where possible. The proposed
planning will also reprovide shading along the footpath temporarily removed
during the construction stage |
In
place by the completion of Construction Phase within the site area, to be
maintained for the duration of Operation Phase |
HyD |
Landscape
Architect/Contractor |
Contractor
(During construction phase) LCSD
(during operation phase) |
Ö |
|
Ö |
|
||
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for
Salisbury Road Underpass and Associated Road Improvement Works including Middle
Road Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
Table C4 Summary
of Proposed Mitigation Measures for Landscape and Townscape Impacts
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures |
Funding
Dept/agent |
Implementation
Dept/agent |
Maintenance
Agent |
Implementation
Stages |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||||
|
Section
8.8 (Temporary Mitigation Measures |
N/A |
Re-routing
of pedestrian routes away from the work site where possible |
In
place at the commencement and for the duration of the Construction Phase with
the site area |
HyD |
Contractor |
Contractor
(During Construction Phase) |
|
Ö |
|
|
|
Re-routing
of pedestrian routes through well defined public access |
||||||||||
|
Retaining
and minimizing damage to vegetation where possible. Care shall be taken not to damage those trees identified
in the Tree Survey Report to be retained during the construction phase |
||||||||||
|
Careful and efficient transplanting of existing
vegetation carried out under the supervision of a professional landscape
architect |
||||||||||
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for Salisbury
Road Underpass and Associated Road Improvement Works including Middle Road
Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
Table C4 Summary
of Proposed Mitigation Measures for Landscape and Townscape Impacts (continued)
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures |
Funding
Dept/agent |
Implementation
Dept/agent |
Maintenance
Agent |
Implementation
Stages |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||||
|
Section
8.8 (Temporary Mitigation Measures) |
N/A |
Mitigation for vegetation loss may be achieved in
the form of compensatory planting of transplanting of existing trees in the area
or new plant material as suggested in the Tree Survey Report. This is recommended to be implemented
on the footpaths of Salisbury Road where space allows |
In
place at the commencement of the Construction Phase within the site area, to
be maintained for the duration of Operation Phase |
HyD |
Contractor
(The detailed landscape proposal shall be provided to LCSD for endorsement) |
Contractor
(During Construction Phase) HyD
(first 12 months of operational phase) LCSD
(after first 12 months in operational phase) |
Ö |
|
Ö |
Works
Bureau Technical Circular No. 24/94 |
|
Relocation of existing trees within the site and
where possible, ensuring transplanted trees are to be planted to new position
within the site |
Landscape
Architect / Contractor |
Ö |
|
Ö |
||||||
|
Planting of heavy standard trees along footpaths
of Salisbury Road to create vegetation screen |
||||||||||
|
Detailing of street furniture such as footpath
surfaces and railings to enhance the pedestrian environment |
Contractor |
HyD |
Ö |
Ö |
|
|||||
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for
Salisbury Road Underpass and Associated Road Improvement Works including Middle
Road Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
Table C4 Summary
of Proposed Mitigation Measures for Landscape and Townscape Impacts (continued)
|
EIA
Ref. |
EM&A
Log Ref |
Environmental
Protection Measures |
Location/Duration of measures |
Funding
Dept/agent |
Implementation
Dept/agent |
Maintenance
Agent |
Implementation
Stages |
Relevant
Legislation and Guidelines |
||
|
Des |
Con |
Op |
||||||||
|
Section
8.8 (Temporary Mitigation Measures) |
N/A |
Planting of flowering trees and shrubs etc, shall
be considered so as to create colour impacts, strong sense of seasonal
changes and where possible, provide shade for the pedestrians |
In
place at the commencement of the Construction Phase within the site area, to
be maintained for the duration of Operation Phase |
HyD |
Landscape
Architect/Contractor |
Contractor
(During Construction Phase) HyD
(first 12 months of operational phase) LCSD
(after first 12 months in operational phase) |
Ö |
|
Ö |
Works
Bureau Technical Circular No. 24/94 |
Notes:
1.
Des = Design, C = Construction, O = Operation
2.
EIA Ref = Section number reference in EIA for
Salisbury Road Underpass and Associated Road Improvement Works including Middle
Road Circulation System (Final EIA Report (June 1999))
3.
EM&A Log ref = Section number reference in
EM&A Manual
|
|
Photo
1
|
|
|
|
Photo 2 |
Record Photos for EM&A Works
Contract No. HY/98/22
Supplementary Agreement No. 3
Road Widening Works of Salisbury Road
between Nathan Road and Canton Road