Contract title :
HY/2000/02 - Castle Peak Road Improvement between Area 2 and Ting Kau, Tsuen Wan
HY/99/19 - Castle Peak Road Improvement between Ting Kau and Sham Tseng, Tsuen Wan
Contractor :
HY/2000/02: China State Construction Engineering (Hong Kong) Ltd.
HY/99/19: China State Construction Engineering (Hong Kong) Ltd.
Construction Commencement Date :
HY/2000/02: August 2001
HY/99/19: May 2002
Commissioning Date :
HY/2000/02: March 2005
HY/99/19: July 2006
Contract Value ($Million) :
HY/2000/02: 843
HY/99/19: 963
Description :
The project includes:
- widening and realignment of a 4.6km long section of Castle Peak Road between Area 2 and Sham Tseng, Tsuen Wan to dual two-lane carriageway with 3m wide footpath on both sides;
- construction of a 300-metre long single lane flyover in Ting Kau and six covered footbridges;
- limited reclamation and associated construction of 310m long seawall;
- installation of 430m long partial noise enclosure;
- provision of recreational facilities at three affected beaches; and
- associated works on road reconstruction, junction modifications, slope stabilization, geotechnical, landscape, lighting and drainage.