Major Projects
 

(updated as at 31.05.2007)

Improvements to Island Eastern Corridor section between North Point Interchange and Sai Wan Ho

Contract title :
Improvements to Island Eastern Corridor section between North Point Interchange and Sai Wan Ho

Contractor :
Gammon Construction Limited.

Construction Commencement Date :
July 2000

Commissioning Date :
July 2003

Contract Value ($Million):
688

Improvements to Island Eastern Corridor section between North Point Interchange and Sai Wah Ho
pdf format File size: ( 1.26 mb )
 
#
Progress Photographs

Description

The project includes :
 

(i) construction of a 800-metre long section of two-lane elevated      carriageway in the eastbound direction between Man Hong Street and Eastern Harbour Crossing (EHC);
(ii) construction of a 1.4-kilometre long section of single-lane arriageway including a 400-metre long section of elevated carriageway and a 45-metre long section underpass in the westbound direction from Tai Cheong Street at Sai Wan Ho to the west of EHC;
(iii) construction of 2 additional slip roads for the westbound traffic each from Kornhill Flyover and the Sai Wan Ho slip road, and realignment of the existing slip road at Taikoo Shing Interchange; and
(iv) construction of various sections of carriageway at grade, recreational facilities along a promenade and other ancillary works including drainage, landscaping, retaining wall, traffic aids, lighting and street furniture.