| (i) |
construction
of a 800-metre long section of two-lane elevated carriageway
in the eastbound direction between Man Hong Street
and Eastern Harbour Crossing (EHC); |
| (ii) |
construction
of a 1.4-kilometre long section of single-lane arriageway
including a 400-metre long section of elevated carriageway
and a 45-metre long section underpass in the westbound
direction from Tai Cheong Street at Sai Wan Ho to the
west of EHC; |
| (iii) |
construction
of 2 additional slip roads for the westbound traffic
each from Kornhill Flyover and the Sai Wan Ho slip
road, and realignment of the existing slip road at
Taikoo Shing Interchange; and |
| (iv) |
construction
of various sections of carriageway at grade, recreational
facilities along a promenade and other ancillary works
including drainage, landscaping, retaining wall, traffic
aids, lighting and street furniture. |