Improvement and Extension of Kam Pok Road
(updated as at 31.3.2012)
Contract Title:
HY/2010/09 – Improvement and Extension of Kam Pok Road
Contractor:
Wang Kee Construction Company Limited
Construction Commencement Date:
11 July 2011
Commissioning Date:
March 2013
Contract Sum ($Million):
123.8
Description:
The scope of the contract mainly includes:
- construction of a new section of single two-lane carriageway
of approximately 490 metres (m) in length and 10.3 m in width with
associated footpaths of 2 m in width connecting the existing Kam Pok
Road to Castle Peak Road (Tam Mi);
- improvement of a section of Kam Pok Road of approximately
145 m in length (east of Pok Wai South Road) to a single two-lane carriageway
of 10.3 m in width with associated footpaths of 2 m in width;
- improvement of a road section of approximately 155 m in length
between Yau Pok Road and Man Yuen Road to a single two-lane carriageway
of 7.3 m in width with associated footpaths of 2 m in width;
- construction of sections of cycle tracks of 360 m in length and 3.5 m in width along a section of Kam Pok Road; and
- ancillary works including drainage, water supplies, slope and landscaping works, construction of vertical noise barriers and provision of lighting.