Major Projects

Improvement and Extension of Kam Pok Road

(updated as at 31.3.2012)

Contract Title:

HY/2010/09 – Improvement and Extension of Kam Pok Road

Contractor:

Wang Kee Construction Company Limited

Construction Commencement Date:

11 July 2011

Commissioning Date:

March 2013

Contract Sum ($Million):

123.8

Description:

The scope of the contract mainly includes:

  1. construction of a new section of single two-lane carriageway of approximately 490 metres (m) in length and 10.3 m in width with associated footpaths of 2 m in width connecting the existing Kam Pok Road to Castle Peak Road (Tam Mi);
  2. improvement of a section of Kam Pok Road of approximately 145 m in length (east of Pok Wai South Road) to a single two-lane carriageway of 10.3 m in width with associated footpaths of 2 m in width;
  3. improvement of a road section of approximately 155 m in length between Yau Pok Road and Man Yuen Road to a single two-lane carriageway of 7.3 m in width with associated footpaths of 2 m in width;
  4. construction of sections of cycle tracks of 360 m in length and 3.5 m in width along a section of Kam Pok Road; and
  5. ancillary works including drainage, water supplies, slope and landscaping works, construction of vertical noise barriers and provision of lighting.