Major Projects

Tseung Kwan O Further Development - Design and Build of Infrastructure Works for Tseung Kwan O Stage I Landfill Site (Phase I)

(updated as at 30.11.2011)

Contract Title :

HY/2009/05 – Tseung Kwan O Further Development - Design and Build of Infrastructure Works for Tseung Kwan O Stage I Landfill Site (Phase I)

Contractor :

Kaden – VSL Joint Venture

Construction Commencement Date :

29 December 2009

Commissioning Date:

April 2012 (Tentative)

Contract Sum ($Million) :

128.9

Description :

The scope of works comprises:

  1. design and construction of an approximately 2km long footpath and an approximately 1.6km long cycle track at the Tseung Kwan O Stage I landfill toe and in Tseung Kwan O Town Centre South;
  2. design and construction of an approximately 140m long bridge for pedestrians and cyclists across the eastern channel, with approximately 335m long approach roads and a lift;
  3. design and construction of an approximately 1km long grasscrete paved access along the landfill toe;
  4. design and construction of landscaping works including a landscape area and walking trails; and
  5. associated slope, drainage and ancillary works.