Tseung Kwan O Further Development - Design and Build of Infrastructure Works for Tseung Kwan O Stage I Landfill Site (Phase I)
(updated as at 30.11.2011)
Contract Title :
Contractor :
Kaden – VSL Joint Venture
Construction Commencement Date :
29 December 2009
Commissioning Date:
April 2012 (Tentative)
Contract Sum ($Million) :
128.9
Description :
The scope of works comprises:
- design and construction of an approximately 2km long footpath and an approximately 1.6km long cycle track at the Tseung Kwan O Stage I landfill toe and in Tseung Kwan O Town Centre South;
- design and construction of an approximately 140m long bridge for pedestrians and cyclists across the eastern channel, with approximately 335m long approach roads and a lift;
- design and construction of an approximately 1km long grasscrete paved access along the landfill toe;
- design and construction of landscaping works including a landscape area and walking trails; and
- associated slope, drainage and ancillary works.