Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling (Stage 1 - between Ma Wo and Tai Hang)

(updated as at 31.12.2011)

Contract Title :

HY/2009/08 – Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling (Stage 1 - between Ma Wo and Tai Hang)

Consultant :

Hyder - Arup - Black & Veatch Joint Venture

Contractor :

Gammon Construction Limited

Construction Commencement Date :

26 February 2010

Commissioning Date :

End 2013

Contract Sum ($Million) :

2,382

Description :

The Contract "Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling (Stage 1 - between Ma Wo and Tai Hang)" comprises 3.5km dual 3-lane carriageway from Ma Wo to Tai Hang

The scope of the contract mainly includes:

  1. widening of 3.3-km long section of Tolo Highway between Ma Wo and Tai Hang from the existing dual 3-lane carriageway to a dual 4-lane carriageway with standard hard shoulders; and provision of a 0.2-km long transition to match with the existing road at Tai Hang;   
  2. widening of the interchange section at Tai Po North Interchange and Lam Kam Road Interchange from dual 2-lane to dual 3-lane; and realignment of the associated slip roads at the interchanges;  
  3. construction of eight vehicular bridges and modification/demolition of five existing bridges; 
  4. construction of carriageways on proposed vehicular bridges, at-grade carriageways and access slip roads;   
  5. ancillary works including drainage and sewerage, geotechnical and landscaping works, construction of water-mains, installation of fire hydrants, construction of noise barriers and retaining walls.