

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
(Stage 1 - between Island House Interchange and Ma Wo)
(updated as at 31.12.2011)
Contract Title :
Consultant :
Hyder - Arup - Black & Veatch Joint Venture
Contractor :
China State Construction Engineering (Hong Kong) Limited
Construction Commencement Date :
27 August 2009
Commissioning Date :
Mid 2013
Contract Sum ($Million) :
1,850
Description :
The Contract "Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling (Stage 1 - between Island House Interchange and Ma Wo)" comprises 2.4km dual 3-lane carriageway from Island House Interchange to Ma Wo
The scope of the contract mainly includes:
- widening of Tolo Highway from existing dual 3-lane to dual 4-lane between Island House Interchange and Ma Wo;
- widening of the interchange section at Island House Interchange from existing dual 2-lane to dual 3-lane, including realigning the various slip roads;
- demolition and reconstruction of highways structures comprising Banyan Bridge, Banyan West Bridge;
- construction of Bridges No. 10A, 11A and New Lam Kam Railway overbridge;
- modification and stitching of existing Bridge No. 10, 11 and Lam Kam Railway overbridge;
- slopeworks and construction of retaining walls;
- installation of noise barriers; and
- ancillary works including civil, drainage, structural, geotechnical, traffic aids, landscape works, waterworks, fire hydrants installation, and electrical and mechanical installations associated with the road widening works.
Related Sites :
- Notice and Plans for Revised Expressway Boundaries for Tolo Highway under Road Traffic Ordinance (Chapter 374)
For more information, please visit Contract Web Site.











