Central - Wan Chai Bypass and Island Eastern Corridor Link

Project Description:

The Central - Wan Chai Bypass and Island Eastern Corridor Link under construction forms part of an east-west strategic route along the north shore of Hong Kong Island, which serves to alleviate the traffic congestion along the existing Gloucester Road - Harcourt Road - Connaught Road Central corridor.

The Project includes construction of a 4.5 km long dual three-lane trunk road with a 3.7 km long tunnel,connecting the Rumsey Street Flyover at Central with the Island Eastern Corridor at North Point near City Garden.

More information can be found in the project website.

Estimated Project Cost:

HK$36 Billion

Construction Commencement Date:

Dec 2009

Anticipated Commissioning Date:

End 2017

Contract(s):

Contract No. HY/2009/16

Scope Retrieval of existing moorings at Causeway Bay Typhoon Shelter and provision of new moorings at Aberdeen Typhoon Shelter (South)
Commencement Date Dec 2009
Completion Date May 2010
Contract Sum HK$52 Million
Contractor Yee Hop Engineering Co. Ltd
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2009/11

Scope Reclamation at North Point between Power Street and the breakwater near Hing fat Street.
Commencement Date Dec 2009
Completion Date Nov 2011
Contract Sum HK$303 Million
Contractor China Harbour Engineering Company Ltd and China Road and Bridge Corporation Joint Venture Construction
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2009/17

Scope Re-provision of FEHD Whitfield depot and construction of a one-floor basement carpark.
Commencement Date Feb 2010
Completion Date Apr 2013
Contract Sum HK$217 Million
Contractor Lam Woo & Company Limited
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2009/18

Scope To construct the Central Interchange that connects Central-Wan Chai Bypass to the road network at Central.
Commencement Date Sep 2010
Anticipated Completion Date Mid 2016
Contract Sum HK$1.27 Billion
Contractor Leighton Contractors (Asia) Limited
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2009/15

Scope To construct the section of tunnel that connects ex-Wan Chai Public Cargo Working Area and Causeway Bay Typhoon Shelter
Commencement Date Sep 2010
Anticipated Completion Date Early 2016
Contract Sum HK$5.38Billion
Contractor China State Construction Engineering (HK) Limited
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2009/19

Scope To construct the section of tunnel in North Point and the approach road connecting the tunnel and the Island Eastern Corridor.
Commencement Date Jan 2011
Anticipated Completion Date Mid 2018
Contract Sum HK$4.02 Billion
Contractor Chun Wo-CRGL-MBEC Joint Venture
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2010/08

Scope Construction of tunnel under the seabed of Causeway Bay Typhoon Shelter and the slip road connecting to Tin Hau.
Commencement Date Mar 2013
Anticipated Completion Date Mid 2017
Contract Sum HK$4.79 Billion
Contractor China State Construction Engineering (HK) Limited
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

Contract No. HY/2011/08

Scope Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning.
Commencement Date Feb 2014
Anticipated Completion Date End 2017
Contract Sum HK$3.18 Billion
Contractor Leighton Joint Venture
Resident Engineer AECOM Asia Company Limited

More information can be found in the contract website.

 

Consultant:

AECOM Asia Co. Ltd.(Investigation, Design and Construction)

Other Related Information: