TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Quarter

2.**** SUMMARY OF EM&A REQUIREMENTS

Monitoring Parameters and Locations

Monitoring Methodology and Calibration Details

Environmental Quality Performance Limits (Action and Limit Levels)

Environmental Mitigation Measures

3.**** MONITORING RESULTS

Monitoring Locations

Air Quality

Noise*

4.**** ENVIRONMENTAL AUDIT

Implementation Status of Environmental Mitigation Measures

Status of Environmental Licensing and Permitting

Advice on Solid and Liquid Waste Management Status

5.**** LANDSCAPE AND VISUAL AUDIT

Landscape and visual

6.**** NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)

Summary of Exceedance

7.**** ENVIRONMENTAL COMPLAINTS

Complaint Log

Complaint Response Procedure

8.**** NOTIFICATION OF SUMMONSES AND SUCCESSFUL PROSECUTIONS

Notification of Summonses

9.**** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

List of Tables

 

 

Table 1.1** Construction Activities from September to November 2005

Table 3.1** Locations of Air & Noise Monitoring Stations

Table 4.1** Estimated Amounts of Waste Generated from September to November 2005

 

 

List of Figures

 

Figure 1.1**Project Organisation

Figure 1.2**Layout of Work Site

Figure 2.1**Locations of Air Quality and Noise Monitoring Stations

 

List of Appendices

 

Appendix A*** Contact of Key Environmental Personnel

Appendix B*** Action and Limit Level

Appendix C ***Summary of Environmental Mitigation Implementation Schedule

Appendix D*** Graphical Presentation of Air Quality Monitoring Results

Appendix E*** Graphical Presentation of Noise Monitoring Results

Appendix F****Status of Environmental Licensing and Permitting

Appendix G*** Summary of Complaints

Appendix H*** Complaint Flow Diagram and Complaint Log