TABLE OF CONTENTS
Background
Project
Organisation
Construction
Works undertaken during the Reporting Quarter
2.**** SUMMARY OF EM&A REQUIREMENTS
Monitoring
Parameters and Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Environmental
Mitigation Measures
Monitoring
Locations
Air
Quality
Noise*
Implementation
Status of Environmental Mitigation Measures
Status
of Environmental Licensing and Permitting
Advice on Solid and Liquid Waste Management Status
5.**** LANDSCAPE AND VISUAL AUDIT
Landscape
and visual
Summary
of Exceedance
7.**** ENVIRONMENTAL COMPLAINTS
Complaint
Log
Complaint
Response Procedure
8.**** NOTIFICATION OF SUMMONSES AND SUCCESSFUL PROSECUTIONS
Notification
of Summonses
9.**** CONCLUSIONS AND RECOMMENDATIONS
Conclusions
List of
Tables
Table 1.1** Construction Activities from September to November 2005
Table 3.1** Locations of Air & Noise Monitoring
Stations
Table 4.1** Estimated Amounts of Waste Generated from September to November 2005
List of
Figures
Figure 1.1**Project
Organisation
Figure 1.2**Layout of
Work Site
Figure 2.1**Locations
of Air Quality and Noise Monitoring Stations
List of
Appendices
Appendix A*** Contact
of Key Environmental Personnel
Appendix B*** Action
and Limit Level
Appendix C ***Summary
of Environmental Mitigation Implementation Schedule
Appendix D*** Graphical
Presentation of Air Quality Monitoring Results
Appendix E*** Graphical
Presentation of Noise Monitoring Results
Appendix F****Status
of Environmental Licensing and Permitting
Appendix G*** Summary
of Complaints
Appendix H*** Complaint
Flow Diagram and Complaint Log