COVER

TABLE OF CONTENTS

EXECUTIVE SUMMARY

1.***** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Quarter

2.***** Summary of EM&A Requirements

Monitoring Parameters and Locations

Monitoring Methodology and Calibration Details

Environmental Quality Performance Limits (Action and Limit Levels)

Environmental Mitigation Measures

3.***** MONITORING Results

Monitoring Locations

Air Quality

Noise

4.***** ENVIRONMENTAL AUDIT

Implementation Status of Environmental Mitigation Measures

Status of Environmental Licensing and Permitting

Advice on Solid and Liquid Waste Management Status

5.***** Landscape and visual audit

Landscape and visual

6.**** NON-compliance (exceedances) of the environmeNtal quality performance limits (action and limit levels)

Summary of Exceedance

7.***** environMental complaints

Complaint Log

Complaint Response Procedure

8.***** Notification of summonses and successful prosecutions

Notification of Summonses

9.***** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

List of Tables

 

Table 1.1****Construction Activities from September 2004 to November 2004

Table 3.1****Locations of Air & Noise Monitoring Stations

Table 4.1 Estimated Amounts of Waste Generated from September 2004 to November 2004

 

List of Figures

 

Figure 1.1**Project Organisation

Figure 1.2**Layout of Work Site

Figure 2.1**Locations of Air Quality and Noise Monitoring Stations

 

List of Appendices

 

Appendix A Contact of Key Environmental Personnel

Appendix B*Action and Limit Level

Appendix C ******Summary of Environmental Mitigation Implementation Schedule

Appendix D**Graphical Presentation of Air Quality Monitoring Results

Appendix E**Graphical Presentation of Noise Monitoring Results

Appendix F*****Status of Environmental Licensing and Permitting

Appendix G**Summary of Complaints

Appendix H**Complaint Flow Diagram and Complaint Log