TABLE OF CONTENTS
Background
Project Organisation
Construction Works undertaken
during the Reporting Quarter
2.***** Summary
of EM&A Requirements
Monitoring Parameters and
Locations
Monitoring Methodology and
Calibration Details
Environmental Quality Performance
Limits (Action and Limit Levels)
Environmental Mitigation Measures
Monitoring Locations
Air Quality
Noise
Implementation Status of
Environmental Mitigation Measures
Status of Environmental Licensing
and Permitting
Advice on Solid and Liquid Waste
Management Status
5.***** Landscape
and visual audit
Landscape and visual
6.**** NON-compliance
(exceedances) of the environmeNtal quality performance limits (action and
limit levels)
Summary of Exceedance
7.***** environMental
complaints
Complaint Log
Complaint Response Procedure
8.***** Notification
of summonses and successful prosecutions
Notification of Summonses
9.***** CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
List of Tables
Table 1.1****Construction Activities from
September 2004 to November 2004
Table 3.1****Locations of Air & Noise
Monitoring Stations
Table 4.1 Estimated Amounts of Waste
Generated from September 2004 to November 2004
List of Figures
Figure
1.1**Project Organisation
Figure
1.2**Layout of Work Site
Figure
2.1**Locations of Air Quality and Noise
Monitoring Stations
List of Appendices
Appendix
A Contact of Key Environmental Personnel
Appendix
B*Action and Limit Level
Appendix
C ******Summary of Environmental
Mitigation Implementation Schedule
Appendix
D**Graphical Presentation of Air Quality
Monitoring Results
Appendix
E**Graphical Presentation of Noise
Monitoring Results
Appendix
F*****Status of Environmental Licensing
and Permitting
Appendix
G**Summary of Complaints
Appendix
H**Complaint Flow Diagram and Complaint
Log