TABLE OF CONTENTS

 

 

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Quarter

2.**** Summary of EM&A Requirements

Monitoring Parameters and Locations

Monitoring Methodology and Calibration Details

Environmental Quality Performance Limits (Action and Limit Levels)

Environmental Mitigation Measures

3.**** MONITORING Results

Monitoring Locations

Air Quality

Noise

4.**** ENVIRONMENTAL AUDIT

Implementation Status of Environmental Mitigation Measures

Status of Environmental Licensing and Permitting

Advice on Solid and Liquid Waste Management Status

5.**** Landscape and visual audit

Landscape and visual

6.**** NON-compliance (exceedances) of the environmeNtal quality performance limits (action and limit levels)

Summary of Exceedance

7.**** environMental complaints

Complaint Log

Complaint Response Procedure

8.**** Notification of summonses and successful prosecutions

Notification of Summonses

9.**** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

 

 

 

List of Tables

 

Table 1.1*****Construction Activities from June 2004 to August 2004

Table 3.1*****Locations of Air & Noise Monitoring Stations

Table 4.1*****Estimated Amounts of Waste Generated from June 2004 to August 2004

 

List of Figures

 

Figure 1.1 Project Organisation

Figure 1.2 Layout of Work Site

Figure 2.1 Locations of Air Quality and Noise Monitoring Stations

 

List of Appendices

 

Appendix A*****Contact of Key Environmental Personnel

Appendix B*****Action and Limit Level

Appendix C **** Summary of Environmental Mitigation Implementation Schedule

Appendix D*****Graphical Presentation of Air Quality Monitoring Results

Appendix E*****Graphical Presentation of Noise Monitoring Results

Appendix F*****Status of Environmental Licensing and Permitting

Appendix G*****Summary of Complaints

Appendix H*****Complaint Flow Diagram and Complaint Log