TABLE OF CONTENTS
Background
Project Organisation
Construction Works undertaken during the Reporting Month
2.**** Summary
of EM&A Requirements
Monitoring Parameters and Locations
Monitoring Methodology and Calibration Details
Environmental Quality Performance Limits (Action and Limit
Levels)
Environmental Mitigation Measures
Monitoring Locations
Air Quality
Noise..
Implementation Status of Environmental Mitigation Measures
Status of Environmental Licensing and Permitting
Advice on Solid and Liquid Waste Management Status
5.**** Landscape
and visual audit
Landscape and visual
6.**** NON-compliance
(exceedances) of the environmeNtal quality performance limits (action and
limit levels)
Summary of Exceedance
Review of the Reasons for the Implications of
Non-compliance
7.**** environMental
complaints
Complaint Log
Complaint Response Procedure
8.**** Notification
of summonses and successful prosecutions
Notification of Summonses
9.**** CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
List of Tables
Table
1.1*****Construction Activities from December
2003 to February 2004
Table
3.1*****Locations of Air & Noise Monitoring
Stations
Table
4.1*****Estimated Amounts of Waste Generated
from December 2003 to February 2004
Table
6.1*****Summary of Number of Exceedances
from December 2003 to February 2004
List of Figures
Figure
1.1**** Project Organisation
Figure
1.2**** Layout of Work Site
Figure
2.1**** Locations of Air Quality
and Noise Monitoring Stations
List of Appendices
Appendix
A*****Contact of Key Environmental
Personnel
Appendix
B*****Action and Limit Level
Appendix
C **** Summary of Environmental Mitigation
Implementation Schedule
Appendix
D*****Graphical Presentation of
Air Quality Monitoring Results
Appendix
E*****Graphical Presentation of
Noise Monitoring Results
Appendix
F*****Status of Environmental Licensing
and Permitting
Appendix
G*****Summary of Complaints
Appendix
H*****Complaint Flow Diagram and
Complaint Log